Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2457
Entry time:
Tuesday, June 13, 2023, 11:49
Author:
Frank Song
Category:
North Hot-Cell
Type:
Standard Operation
Module:
TM4
Target/Number:
SiC#45
Subject:
electrical check and leak check
TM4 with new target SiC#45 installed has been leak checked and electrical checked on top of NHC.
Attachment 1:
TM4_with_SiC#45_leak&electric_check_on_top_of_NHC.png
1.241 MB
|
Show
|
Hide all
ELOG V2.9.2-2455