Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2439
Entry time:
Monday, May 08, 2023, 10:59
Author:
Frank Song
Category:
North Hot-Cell
Type:
Standard Operation
Module:
TM4
Target/Number:
TiC#5
Subject:
electrical check/leak check
TM4 with target TiC#5 installed has been leak checked and electric checked on NHC.
Attachment 1:
TM4_with_TiC#5_20230508.png
1.349 MB
|
Show
|
Hide all
ELOG V2.9.2-2455