ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  2480   Monday, August 28, 2023, 12:16 Frank SongNorth Hot-CellRepairTM2Nb#11electric/leak check TM2 with new target Nb#11 has been
E/L checked sitting on NHC.
 TM2_with_Nb#11_electical_and_leak_check_in_NHC_2023-08-28.pdf 
  2484   Tuesday, August 29, 2023, 10:45 Frank SongNorth Hot-CellStandard OperationTM4UCx#42electrical check   TM4 with spent target UCx#42
has been electric checked at NHCpost right
after transferred from ITE.
 TM4_with_UCx42_electric_check_with_spent_target_at_NHCPost__2023-08-29.pdf 
  2485   Tuesday, August 29, 2023, 14:32 Frank SongNorth Hot-CellStandard OperationTM4Ta#65electrical check/leak check TM4 with new target Ta#65 has been
E/L checked at NHCPost.
 TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf 
  2486   Tuesday, August 29, 2023, 14:32 Frank SongNorth Hot-CellStandard OperationTM4Ta#65electrical check/leak check TM4 with new target Ta#65 has been
E/L checked at NHCPost.
 TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf 
  2627   Thursday, June 27, 2024, 09:49 David WangNorth Hot-CellStandard Operation Nb#10Nb#10target has been remotely transferred from NHC to SHC. Nb#10target has been remotely  transferred
from NHC to SHC.  
  
  2679   Wednesday, September 11, 2024, 13:38 Adam NewsomeNorth Hot-CellRepair  Spare Manipulator - Y-axis motion not functioningUpdate 2024-09-12:
C. Fisher confirms this is actually normal
behaviour. The Y-axis motion is inhibited
  
  2681   Monday, September 16, 2024, 08:23 chad fisherNorth Hot-CellRepair  Model N Remote end #9352 reapirOn Friday, September 6, 2024 Model 'N'
remote arm #9352 was removed from the NHC
right side installed position to investigate 
  
  2682   Monday, September 16, 2024, 08:48 chad fisherManipulator MaintenanceMaintenance  CRL Technicain Manipulator Maitenance TripOver the course of September 9th - September
13, 2024 a CRL manipulator technician carried
out the following manipulator maintenance:
 Triumf_Document_2024-09-20_102936.pdf 
  2598   Thursday, May 23, 2024, 11:10 David WangMAAStandard Operation  BL2A MAA ASU test.MCR Travis Curucz and I finished BL2A MAA
ASU test per document 154779. everything
works fine. Travis kept  the test document.
  
  2666   Monday, August 19, 2024, 15:29 Frank SongITW/ITEStandard OperationTM2Ta#67shielding blocks transfer 5 shielding blocks have been transferred
from ITW to ITE, MAA has been secured after
moving.
  
  2706   Tuesday, October 15, 2024, 12:57 Frank SongITW/ITEStandard Operation  shielding blocks transfer 5 shielding blocks are transferred
from ITW to ITE, Target Area is secured again
after moving.
  
  18   Wednesday, August 03, 2011, 11:24 Travis CaveITWStandard OperationTM1Ta#37Module moveTM#1 with Ta#37 has been moved from the
conditioning station to the the west target
station, move went well.
  
  19   Wednesday, August 17, 2011, 13:09 Bevan MossITWStandard OperationTM1Ta #37TM1 move from ITW to Hot Cell TM1 with Ta #37 target was moved
from ITW to the south hot cell. The rotation
of TM1 may have been off slightly during
  
  26   Thursday, September 01, 2011, 09:11 Don JacksonITWStandard OperationTM1UCx#2Argon Venting West StationWest target station is setup to use argon
for tank venting.  There is 1200 PSI
remaining on argon bottle in electrical room. 
  
  32   Monday, October 03, 2011, 11:00 Travis CaveITWStandard OperationTM1UCx#2Move from west station to south hot cellTM#1 with UCx#2 has been moved from the
west station to the south hot cell. Move
went well.
  
  35   Tuesday, October 04, 2011, 14:13 Travis CaveITWStandard OperationTM1TaC#1Move ot TM#1Move of TM#1 with the TaC#1 target has
been moved from the south hot cell to the
west target station.
  
  50   Monday, November 14, 2011, 14:07 Travis CaveITWStandard OperationTM1TaC#1Module moveTM#1 with TaC#1 from the west target station
to the south hot cell. Move went well.
  
  62   Thursday, November 24, 2011, 10:39 Travis CaveITWStandard OperationTM1UCx#3Module moveTM#1 with UCx#3 moved from conditioning
station to west target station. Move went
well.
  
  63   Thursday, November 24, 2011, 10:40 Travis CaveITWStandard OperationTM1UCx#3Module moveTM#1 with UCx#3 moved from the conditioning
station to the west target station.
  
  72   Wednesday, February 01, 2012, 09:54 David WangITWMaintenanceTM1 ITW and TM1 winter shut down vacuum leak checkITW and TM1 winter shut down vacuum leak
check had been finished yesterday.All ITW
primary vacuum vessel, secondary vacuum vessel,
  