  RH-ISAC, Page 37 of 141  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Monday, August 19, 2024, 09:32, David Wang, Conditioning Station, Standard Operation, TM4, Ta#68 , TM4 has been moved from SHC to TCS. 

TM4 has been moved from SHC to TCS. The move is successful.

Entry  Friday, August 16, 2024, 13:29, Frank Song, South Hot-Cell, Standard Operation, TM4, Ta#68, electrical check/leak check TM4_with_Ta#68_electric_and_leak_check_on_SHC_2028-08-16.pdf

 New target Ta#68 is installed on TM4 and be leak/electric checked. Pls see attachment.

Entry  Tuesday, October 08, 2024, 11:20, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#68, Ta#68 install onto TM2, w/ Troubleshooting  17x

October 7, 2024 - Aaron Tam 

Ta#68 HP-SIS checks performed at B1 lab, moved to anteroom, and inserted into SHC via tool port w/ Aaron Schmidt. 

Ta#68 fixed to source tray with 4 mounting bolts in order of: Right manip. holding, Top left, Right manip. removed, Bottom right, Top right, bottom left. w/ Aaron Schmidt and Brady Borrmann

  • Motion was smooth, no resistance when positioning onto pins

VCR fittings done up with ample force, leak check passed

Conductor bolts installed in order of: 2 Target electrode conductors (Checked washers), 3 target Inner and outer conductors.

All bolts checked for full contact with mirror and binos. 

Electrical check failed: Dead short (look for David's ELOG for more detail when available) 

Troubleshooting while David is checking resistance: w/ Ferran

  • Intermittent success with heavy manipulation of water lines
    • Loosening off Waterline bracket-to-source-tray 
    • Loosening off Bracket to water line bolts 5/32 hex's 
    • Rotating bracket towards operator (effectively raising waterlines in the back upwards) seems to yield more intermittent success, but never passing megger @ 250V 
    • Tube was inadvertently dented when handling the tube in a wrenching motion with manip tong. counterclockwise
  • Target removed while David is still on the multimeter (calling for any sign of success)
    • Starting to remove Target in order of: Tightening back waterline-to-bracket 5/32 hex screws, loosening off waterline bracket, loosening off VCR nuts, 2 Target electrode conductor bolts, 3 Target inner and outer conductor bolts, Fixing bolts Top left (dropped below source tray), Bottom right...
      • (At this time David called with some success with electrical check)
    • Reversing course to verify fault has passed, target was reassembled, only finger loose on the VCR nuts.
    • Faults no longer present
    • Target removed
      •  As target was being pulled off source tray locating pins, a piece of ceramic fell onto the source tray just behind window waterlines.

Target taken out of Hotcell by Ferran. New VCR gaskets installed. Target reinserted 

Target installed no issues. Used fixing bolt used to replace dropped one. 

Leak check passed, Electrical check passed

  • Notably don't have a photo of reinstalled target or source tray before 2nd install attempt. 

Containment cover reinstalled 

Ceramic piece moved into Pail #285 (suspect this is a very hot piece)

TM2 ready for move to ITE

Entry  Wednesday, October 09, 2024, 14:04, Frank Song, ITE, Standard Operation, TM2, Ta#68, Module Connection TM2_with_new_target_Ta#68_connection_in_ITE.pdf

 TM2 with new target Ta#68 installed is connected in ITE. Pls see form attached.

Entry  Tuesday, December 03, 2024, 10:10, Frank Song, ITE, Standard Operation, TM2, Ta#68, module disconnection TM2_with_spent_target_TA#68_disconnection_in_ITE_2024-12-03.pdf

TM2 with spent target TA#68 was disconnected  in ITE and is being moved to SHC. All water lines are purged for module storage.

Entry  Tuesday, December 03, 2024, 15:53, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#68, Ta#68 Removal 22x

  Note: Ta#68 had a difficult install. See E-log ID# 2698 for more info 

First look:

  • Containment box cover looks the same as previous (See:ID: 2697)
  • Target shows large amount of soot-like deposits (See photos for locations)
  • Deposits seem to have been left on parts of the service tray as well ie.: Multipin connector 

Removal:

  • Removal was smooth
  • Water-line bracket fixing bolts seemed loose even before I put a tool to them 

Eyes of sides:

  • Better photos of where deposits are 
  • Everything else seems normal 
Entry  Wednesday, December 04, 2024, 14:30, Aaron Tam, South Hot-Cell, Standard Operation, , Ta#68, Ta#68 PIE 32x

 Abstract:
This target has seen some irregular beam patterns 
Possibility that the beam hit the walls of the target tube or even the cooling fins
This PIE we want to investigate how the irregular beam physically affected the target 

Related ELOGS: 
ID: 2728
ID: 2698

PIE was performed by Aaron Tam, Directed by Aurelia Laxdal, Observed by Lucas Backes, Special help from Chad Fisher 

External views:

  • Windows are clear of any irregularities 
  • More pictures of this can be found in RH-ISAC E-log 2728

Internal Views:

  • Heatshield internal
    • Some discolouration from heat and soot deposits.
    • This seems to be fairly clean to normal amounts - not concerning 
  • Target tube
    • tube is bent with the middle higher than the sides
    • Target tube was not removed 9/64ths allen wrench could not be located for this operation 
  • Target tube Exit
    • Heatshield windows were punctured to reveal the target tube entraces/exits
    • Entrance is waterline side (ITE)
  • Extraction electrode parts were removed from the back off the target
    • These parts look normal
    • some of the extraction electrode would not pull out due to tight fitting parts and the investigation stopped here.

Conclusion: Target physical condition is normal as far as we could investigate 

Entry  Thursday, December 05, 2024, 11:43, Aaron Tam, South Hot-Cell, Standard Operation, , Ta#68, Pail loading - Ta#68 & Others into Pail#300 Pail_Landing.jpgLoaded_Pail.jpgParasitic_Lid_that_was_missed.jpgLocation_of_all_parasitic_type_targets_and_fasteners.jpgParastics_and_Target_stuff_that_went_inside_this_pail.jpg

December 5, 2024 - Aaron Tam w/ help from Chad, Peter and Adam at the Crane  

Hot Cell Prep:

  • Tools organized, working space cleared, spot for clean tool to sit placed, Air tool is open and spinning clockwise for tightening 

Loading:

  • Ta#68 was loaded into pail# 300
  • PEEK seal parasitic assemblies loaded (PEEK seals were removed in ID: 2724)
  • Farran had some old samples that also went in (More details to come when Farran sends the info)

Lid/latching:

  • This went smoothly

Bail attachment:

  • Some difficulty in attaching the Lifting Bail, but went on smoothly with the help of Chad

Notes:

  • One of the PEEK seal parasitic Target assembly lids was missed in the loading. This will have to be loaded next time. 
  • All parasitic type targets remain in the yellow container shown in photos below. 
Entry  Thursday, December 05, 2024, 12:00, Adam Newsome, Spent Target Vault, Standard Operation, , Ta#68, Spent target move - Ta#68 in Pail 300 Storage_Vault_Contents_2024-12-05.pdf

Ta#68 spent target was moved in Pail 300 to storage vault location 5A. The dose rate measured at the South Hot Cell was 429 mSv/h at 1m. The target index spreadsheet has been updated and the current vault configuration is attached to this e-log. At this time, the storage vault is getting quite full - it is planned to remove five pails in January 2025.

Entry  Tuesday, August 13, 2024, 14:23, David Wang, ITE, Standard Operation, TM3, Ta#67., TM2 with Ta#target has been moved from SHC to ITE. 

TM2 with Ta#target has been moved from SHC to ITE. the move is smooth.

Entry  Friday, September 06, 2024, 10:01, David Wang, South Hot-Cell, Standard Operation, TM4, Ta#67 back up. , TM4 has been moved from SMP to SHC. 

TM4 has been moved from SMP to SHC. The move is smooth.

Entry  Monday, August 12, 2024, 15:55, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#67 LP-SIS, Target Loading 

 Ta#67 Target loaded onto TM2

Leak check passed

Electrical test passed after loosening off target electrode conductor screws, and torqueing by feel 

 

Entry  Tuesday, August 13, 2024, 08:39, Frank Song, South Hot-Cell, Standard Operation, TM2, Ta#67, electrical check/leak check TM2_with_Ta@67_electric_and_leak_check_on_SHC.pdf

 TM2 with new target Ta#67 had been electric/leak checked before moving to ITE. See attachment pls.

Entry  Tuesday, August 13, 2024, 14:18, Frank Song, ITE, Standard Operation, TM2, Ta#67, Module Connection TM2_with_Ta#67_connection_in_ITE_20240813.pdf

 TM2 with new target Ta#67 was connected in ITE, all TP are running at their full speed now.

Entry  Monday, August 19, 2024, 15:29, Frank Song, ITW/ITE, Standard Operation, TM2, Ta#67, shielding blocks transfer 

 5 shielding blocks have been transferred from ITW to ITE, MAA has been secured after moving.

Entry  Tuesday, October 01, 2024, 09:16, Frank Song, ITE, Standard Operation, TM2, Ta#67, module disconnection TM2_with_spent_target_Ta#67_disconnection_in_ITE_2024-10-01.pdf

 TM2 with spent target Ta#67 was disconnected in ITE. see attachment pls.

Entry  Tuesday, October 01, 2024, 12:40, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#67, Target Ta#67 Removed from TM2  9x

 October 1, 2024 - Aaron Tam 

Ta#67 LP-SIS removed from TM2

Ta#67 is sitting in SHC awaiting PIE 

TM2 Containment Box Cover has not been reinstalled 

Photos of target removal and module attached 

Entry  Thursday, October 10, 2024, 10:24, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#67, Ta#67 PIE  35x

 Post Irradiation Examination

October 9, 2024 - Aaron Tam w/ Chad Fisher, Aurelia Laxdal, and Lucas Backes 

PIE conducted by Chad with direction from Aurelia. Aaron and Lucas observing/documenting 

Goal: Thin foil target material is somewhat novel, and we should characterize the differences if there are any. 

Photos of the pre-examined target can be seen on ELOG 2697  on Tuesday October 1, 2024, when the target was removed from TM2

Notes:

  • Right most inner/outer target conductor bolts was sitting proud and had threads showing, photo attached
  • Some Black deposit was found on the inside of the heatshield directly below the extraction tube, and loose in powder form inside the heatshield. 
  • Target tube seems to have more of a crystalline texture than previous examinations.
  • When Target tube was being removed, one of the target electrode conductors broke off
  • some dimple texture was found on the target tube windows and this was further explored by prying a channel through the length of one side of the tube to get a better look

Target pieces were placed loosely back within the heatshield, and the lid loosely placed back on.

Awaiting pail loading, and move to storage vault

 

Entry  Wednesday, October 04, 2023, 10:41, Frank Song, South Hot-Cell, Standard Operation, TM2, Ta#66, electrical check/leak check TM2_with_Ta#66_electical_and_leak_check_in_SHC_2023-10-04.pdf

 TM2 with new target Ta#66 had an electrical check and leak check on SHC. 

Entry  Thursday, October 05, 2023, 13:50, Frank Song, ITW, Standard Operation, TM2, Ta#66, Module Connection TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf

 TM2 with new target Ta#66 was connected in ITW. 