Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
867
Entry time:
Monday, March 23, 2015, 14:03
Author:
chad fisher
Category:
South Hot-Cell
Type:
Standard Operation
Module:
Target/Number:
Ta#45
Subject:
Ta#45 inserted into hot cell
Ta#45 has been inserted into the hot cell. Swipe taken of inner tool port area: 100000 counts/min.
ELOG V2.9.2-2455