Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 859     Entry time: Thursday, March 12, 2015, 13:04
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number:  
Subject: 5 Shielding blocks have been transferred from ITE to ITW. 

5 shielding blocks have been transferred from ITE to ITW for next week TM4 move.

ELOG V2.9.2-2455