ID Date Author Category Typedown Module Target/Number Subject Text Attachments
  780   Wednesday, November 05, 2014, 10:20 Travis CaveSouth Hot-CellStandard OperationTM1ThO#1module moveTM#1 with ThO#1 has been moved from the
south hot cell to the west target station.
  
  782   Thursday, November 06, 2014, 08:07 David WangITWStandard OperationTM1ThO#1TM1 has been connected in ITW.TM1 has been connected in ITW. All turbo
pumps are started. The pumping down on ITW
is good so far. The water is supplied to
  
  785   Thursday, November 13, 2014, 13:52 David WangITWStandard OperationTM1ThO#15 Shielding blocks have been transferred from ITE to ITW.Dan and I transferred 5 shielding blocks
from ITE to ITW. The ITW is configured to
take proton beam.
  
  788   Monday, November 17, 2014, 11:38 Travis CaveConditioning StationStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the conditioning station to the north west
silo.
  
  790   Tuesday, November 18, 2014, 10:28 Travis CaveSouth Hot-CellStandard OperationTM4Ta#44module moveTM#4 with Ta#44 has been moved from the
east target station to the south hot cell.
  
  791   Tuesday, November 18, 2014, 11:14 David WangSouth Hot-CellStandard Operation UCx11crane down UCx 11 target into SHC from THI craned down UCx11 target from TH into
SHC. Chad was in SHC service area watching
on it. The source tray moving jig was installed
  
  792   Tuesday, November 18, 2014, 11:15 David WangITEStandard OperationTM4Ta#44TM4 has been disconnected in ITE.Dan and I disconnected TM4 in ITE.   
  793   Wednesday, November 19, 2014, 08:49 chad fisherSouth Hot-CellStandard OperationTM4UCx#11Ta#44 Removed Ucx#11 InstalledTa#44 has been removed from TM4 and UCx#11
has been installed and is ready for testing.
New fasteners were installed for
  
  794   Wednesday, November 19, 2014, 09:18 Travis CaveSouth Hot-CellStandard OperationTM4UC#11Electrical checkTM#4 with UC#11 electrical check done.
See attached PDF for the results.
 TM4_elec_check_UC11_SHC.PDF 
  795   Wednesday, November 19, 2014, 11:12 David WangConditioning StationStandard OperationTM4 CS roughing pump is started. CS roughing pump is started for TM4 and
UCX 11 target.
  
  796   Thursday, November 20, 2014, 11:49 Travis CaveITEStandard OperationTM4UC#11module moveTM#4 with UCx#11has been moved from the
conditioning station to the east target station.
  
  797   Thursday, November 20, 2014, 14:12 David WangITEStandard OperationTM4UCx11TM4 is connected in ITE.TM4 has been connected connect in ITE.
Water is supplied to TM4 module only.
  
  798   Thursday, November 20, 2014, 14:13 David WangConditioning StationStandard OperationTM4UCx11CS and TM4 was vented with Argon gasCS and TM4 was vented with Argon gas this
morning before it was moved from CS to ITE.
  
  799   Friday, November 21, 2014, 10:40 Travis CaveSpent Target VaultStandard Operation Ta#44Spent target moveThe spent Ta#44 target has been removed
from the south hot cell, it was placed in
pail #121 and placed in spot 4A of the storage
 Vault_Storage_November_21_2014.pdf 
  801   Tuesday, November 25, 2014, 12:45 David WangITEStandard OperationTM4UCx115 Shielding blocks have been transferred from ITW to ITE.5 Shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam.
  
  802   Wednesday, November 26, 2014, 11:11 Travis CaveSpent Target VaultStandard Operation Ta#38, Nb#7, TiC#3, NiO#2, and SiC#29Spent targets moved to mini storageThe following targets have been moved to
the mini storage from the target storage
vault:
  
  803   Friday, November 28, 2014, 13:06 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule moveTM#2 with no target or source tray has
been moved from the north east silo to the
south hot cell.
  
  806   Monday, December 01, 2014, 14:48 Travis CaveSpent Target VaultStandard Operation  F-308s movedThe F-308s have been moved into the target
hall,  for filling on wednesday.
  
  809   Thursday, December 04, 2014, 09:49 Travis CaveConditioning StationStandard OperationTM2no targetmodule moveTM#2 has been moved from the south hot
cell to the conditioning station.
  
  810   Thursday, December 04, 2014, 09:54 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical checkResults of electrical check of TM#2 with
no source tray and no containment box attached.
See PDF for results.
 TM2_elec_check_no_source_traySHC.PDF 