Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 869     Entry time: Tuesday, March 24, 2015, 09:47
Author: chad fisher 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#45 
Subject: Ta#45 installed 

Ta#45 has been installed onto TM4 and is ready for leak and electrical check. High current fasteners torqued to 130 in.lbs.

 

 

ELOG V2.9.2-2455