860
|
Thursday, March 12, 2015, 13:33 |
Anders Mjos | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Target inspection | Chad, Anders and Alex inspected the target
this morning. The target had no significant
visible damage to the container. Some material |
|
86
|
Tuesday, April 17, 2012, 10:15 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Nb#6 | Target inserted into south hot cell | Nb#6 has been inserted into the south hot
cell in preparation for ionstallation onto
TM1. During the pre-insertion inspection |
|
115
|
Tuesday, June 05, 2012, 12:20 |
Bevan Moss | South Hot-Cell | Standard Operation | TM1 | Ta#38 | Target inserted into HC | Ta#38 has been placed into the south hot
cell. Swipes of the tool port were taken
there was a count of 600 on the floor and |
|
2301
|
Wednesday, February 02, 2022, 11:05 |
David Wang | Crane | Standard Operation | | | Target hall overhand crane annual insepection. | Tom Kauss finished target hall overhead
crane annual inspection today. The crane
works fine. He issued new inspection tag |
|
1845
|
Thursday, January 03, 2019, 13:41 |
David Wang | Crane | Repair | | | Target hall crane PLC issue. | Target hall crane did not work properly
after power outage during Christmas time.
The only movement could be operated is crane |
|
2411
|
Friday, January 27, 2023, 07:11 |
David Wang | Crane | Standard Operation | | | Target hall Crane annual inspection has beend done. | Tom Kauss inspected target hall crane yesterday.
The crane works fine. Tom has this inspection
record in his file. The inspection tag has |
|
2412
|
Friday, January 27, 2023, 07:15 |
David Wang | Crane | Standard Operation | | | Target hall Crane annual inspection has beend done. | Tom Kauss finished TH crane annual
inspection yesterday. The crane woks fine.
Tom has this inspection record in his file. |
|
525
|
Thursday, October 24, 2013, 15:43 |
Anders Mjos | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Target conductance | The conductance check on the electrical
check was found to be outside of accepted
values for the TBHT at 7.0 mOhm. A successful |
|
526
|
Thursday, October 24, 2013, 15:54 |
Grant Minor | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Target conductance |
|
|
530
|
Friday, October 25, 2013, 14:09 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Target conductance |
|
|
33
|
Monday, October 03, 2011, 11:54 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#2 - TaC#1 | Target change UCx#2-TaC#1 | UCx#2 has been removed from Tm1 and put
in a bucket with a slow argon feed and a
lid placed lossely on top. |
|
2712
|
Wednesday, November 06, 2024, 08:29 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | TiC#9 | Target and Parasitic assemblies removal from TiC#9 | November 5, 2024 - Aaron Tam
TiC#9 HP-SIS removed from TM4
Top left fixing bolt shows |
17x |
2676
|
Tuesday, September 10, 2024, 12:41 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | TiC#9 | Target TiC#9 HP-SIS installed onto TM4 | September 9, 2024 - Aaron Tam
Water from waterline found
puddled on source-tray and containment box.
|
   |
2664
|
Friday, August 16, 2024, 15:32 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | Ta#68 LP-SIS | Target Ta#68 loaded onto TM4 | Target Ta#68 loaded onto TM4
-leak check passed
-Target electrode conductor screws |
|
2697
|
Tuesday, October 01, 2024, 12:40 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 | Target Ta#67 Removed from TM2 | October 1, 2024 - Aaron Tam
Ta#67 LP-SIS removed from TM2
Ta#67 is sitting in SHC awaiting |
9x |
2655
|
Monday, August 12, 2024, 15:55 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 LP-SIS | Target Loading | Ta#67 Target loaded onto TM2
Leak check passed
Electrical test passed after loosening |
|
588
|
Wednesday, January 22, 2014, 15:20 |
Anders Mjos | South Hot-Cell | Standard Operation | | UC#8 | Target Inspection - post beam | The Target Assembly was inspected with
Chad, Jens Henning and Anders today.
The Target Container was |
|
1062
|
Wednesday, September 02, 2015, 09:26 |
David Wang | ITE | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | I attach new Target Hall schedules here
for 2015 fall and winter runs (beam schedule
129). The TH excel sheet schedule for beam |
    |
1082
|
Friday, September 25, 2015, 07:56 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | weekly update see attachment |
 |
1094
|
Tuesday, October 06, 2015, 13:25 |
David Wang | ITE | Standard Operation | TM4 | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | Weekly update target hall schedule. See
attachment 1,2. |
 |