Entry  Thursday, October 24, 2013, 15:43, Anders Mjos, South Hot-Cell, Standard Operation, TM4, Ta#41, Target conductance Ta#41_electrical_measurement_TGHT_in_SHC.pdf
    Reply  Thursday, October 24, 2013, 15:54, Grant Minor, South Hot-Cell, Standard Operation, TM4, Ta#41, Target conductance 
    Reply  Friday, October 25, 2013, 14:09, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#41, Target conductance TM#4_Ta#41_elec_test_SHC.PDF
Message ID: 525     Entry time: Thursday, October 24, 2013, 15:43     Reply to this: 526   530
Author: Anders Mjos 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#41 
Subject: Target conductance 

The conductance check on the electrical check was found to be outside of accepted values for the TBHT at 7.0 mOhm. A successful attempt to reduce the conductance was made by re-tightening the bolts on the TGHT legs in the SHC. Grant operated the manipulator and torqued the bolts to about 1/8 of a turn with the air ratchet. The conductance across the TGHT (A-B) could be improved from 7.0 mOhm to 6.2 mOhm by re-tightening the bolts. The value is still somewhat higher than usual, but was deemed to be acceptable. Measurements attached.

Attachment 1: Ta#41_electrical_measurement_TGHT_in_SHC.pdf  35 kB  | Show | Hide all