Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 115     Entry time: Tuesday, June 05, 2012, 12:20
Author: Bevan Moss 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM1 
Target/Number: Ta#38 
Subject: Target inserted into HC 

Ta#38 has been placed into the south hot cell. Swipes of the tool port were taken there was a count of 600 on the floor and 150 on the walls and top. 

ELOG V2.9.2-2455