The target was inspected today.
It was found that the target tube had broken on both sides of the centre block in the region that contain target material. The Ta-foil heat shield was removed from the let side tube to allow inspection.
Photos can be found on DocuShare:
https://documents.triumf.ca/docushare/dsweb/View/Collection-9357 |