Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 223     Entry time: Wednesday, December 05, 2012, 15:53
Author: Anders Mjos 
Category: South Hot-Cell 
Type: Standard Operation 
Module:  
Target/Number: UCx#5 
Subject: Target inspection - target tube broken 

The target was inspected today.

It was found that the target tube had broken on both sides of the centre block in the region that contain target material. The Ta-foil heat shield was removed from the let side tube to allow inspection.

Photos can be found on DocuShare:
https://documents.triumf.ca/docushare/dsweb/View/Collection-9357

ELOG V2.9.2-2455