Message ID: 1817     Entry time: Monday, November 05, 2018, 14:27
Author: Anders Mjos 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM2 
Target/Number: UC#25 
Subject: Target module disconnected 

Frank and Anders disconnected the water and electrical connections this afternoon after the target was conditioned over the weekend. The heater ramping program ran with the wrong gauge selected, causing the vacuum to go higher than planned. The module will be moved to ITW tomorrow.