Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 29 of 141  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Category Type Module Target/Number Subjectdown
  1686   Tuesday, February 13, 2018, 13:56 Anders MjosITWStandard OperationTM2Ta#55Target module disconnected

TM disconnected by David and Yasmine Feb 8th. One of the water couplings were leaking for a short while when disconnected. NCR 10836 submitted by Max

  1753   Monday, July 16, 2018, 17:41 Anders MjosITEStandard OperationTM4UC#22Target module disconnected

The water and electrical connections were disconnected today as protons remained off after power interruption during the weekend. Vacuum is still connected and operating.

 The vacuum system are disconnected 2018-07-17.  See attachment .

Attachment 1: TM4_UCx_22#__disconnection_check_list_1.pdf
TM4_UCx_22#__disconnection_check_list_1.pdf
Attachment 2: TM4_UCx_22#__disconnection_check_list_2.pdf
TM4_UCx_22#__disconnection_check_list_2.pdf
  1817   Monday, November 05, 2018, 14:27 Anders MjosConditioning StationStandard OperationTM2UC#25Target module disconnected

Frank and Anders disconnected the water and electrical connections this afternoon after the target was conditioned over the weekend. The heater ramping program ran with the wrong gauge selected, causing the vacuum to go higher than planned. The module will be moved to ITW tomorrow.

  223   Wednesday, December 05, 2012, 15:53 Anders MjosSouth Hot-CellStandard Operation UCx#5Target inspection - target tube broken

The target was inspected today.

It was found that the target tube had broken on both sides of the centre block in the region that contain target material. The Ta-foil heat shield was removed from the let side tube to allow inspection.

Photos can be found on DocuShare:
https://documents.triumf.ca/docushare/dsweb/View/Collection-9357

  860   Thursday, March 12, 2015, 13:33 Anders MjosSouth Hot-CellStandard OperationTM1ThO#1Target inspection

Chad, Anders and Alex inspected the target this morning. The target had no significant visible damage to the container. Some material was deposited on the Extraction Electrode.

Phots on DocuShare

  86   Tuesday, April 17, 2012, 10:15 chad fisherSouth Hot-CellStandard OperationTM1Nb#6Target inserted into south hot cell

Nb#6 has been inserted into the south hot cell in preparation for ionstallation onto TM1. During the pre-insertion inspection I noticed that I could see the foil installed into the ionizer tube and that in did not seem to be seated or concentric to the tube itself. I had Anders and Friedhelm check this and they deemed that it was ok.

  115   Tuesday, June 05, 2012, 12:20 Bevan MossSouth Hot-CellStandard OperationTM1Ta#38Target inserted into HC

Ta#38 has been placed into the south hot cell. Swipes of the tool port were taken there was a count of 600 on the floor and 150 on the walls and top. 

  2301   Wednesday, February 02, 2022, 11:05 David WangCraneStandard Operation  Target hall overhand crane annual insepection.

Tom Kauss finished target hall overhead crane annual inspection today. The crane works fine. He issued new inspection tag and e-logged the job. 

  1845   Thursday, January 03, 2019, 13:41 David WangCraneRepair  Target hall crane PLC issue.

Target hall crane did not work properly after power outage during Christmas time. The only movement could be operated is crane rotation. Power is supplied crane. The control board on N-S, E-W and up-down movement showed  F51 error code which is tripped limit.. All these clues pointed to a PLC control problem.  Don dale was asked for help. He used the crane control PLC program on an old computer  in RH control room reset the PLC system. Everything works fine after his reset.

  2411   Friday, January 27, 2023, 07:11 David WangCraneStandard Operation  Target hall Crane annual inspection has beend done.

Tom Kauss inspected target hall crane yesterday. The crane works fine. Tom has this inspection record in his file. The inspection tag has been issued.

  2412   Friday, January 27, 2023, 07:15 David WangCraneStandard Operation  Target hall Crane annual inspection has beend done.

Tom Kauss  finished TH crane annual inspection yesterday. The crane woks fine. Tom has this inspection record in his file. The crane inspection tag has been issued for 2023.

  525   Thursday, October 24, 2013, 15:43 Anders MjosSouth Hot-CellStandard OperationTM4Ta#41Target conductance

The conductance check on the electrical check was found to be outside of accepted values for the TBHT at 7.0 mOhm. A successful attempt to reduce the conductance was made by re-tightening the bolts on the TGHT legs in the SHC. Grant operated the manipulator and torqued the bolts to about 1/8 of a turn with the air ratchet. The conductance across the TGHT (A-B) could be improved from 7.0 mOhm to 6.2 mOhm by re-tightening the bolts. The value is still somewhat higher than usual, but was deemed to be acceptable. Measurements attached.

Attachment 1: Ta#41_electrical_measurement_TGHT_in_SHC.pdf
Ta#41_electrical_measurement_TGHT_in_SHC.pdf
  526   Thursday, October 24, 2013, 15:54 Grant MinorSouth Hot-CellStandard OperationTM4Ta#41Target conductance

Anders Mjos wrote:

The conductance check on the electrical check was found to be outside of accepted values for the TBHT at 7.0 mOhm. A successful attempt to reduce the conductance was made by re-tightening the bolts on the TGHT legs in the SHC. Grant operated the manipulator and torqued the bolts to about 1/8 of a turn with the air ratchet. The conductance across the TGHT (A-B) could be improved from 7.0 mOhm to 6.2 mOhm by re-tightening the bolts. The value is still somewhat higher than usual, but was deemed to be acceptable. Measurements attached.

1. TGHT leg bolts were loosened, and resistance was measured very high, as expected.

2. TGHT leg bolts were then tightened, loosened, and tightened again, and the resistance improvement was then measured (from 7.0 mOhm to 6.2 mOhm).

3. Another attempt was then made to loosen and tighten to see if there would be further improvement.  The right bolt was loosened, but the left bolt was found to be quite stiff and was left as-is (not fully loosened) for fear of breaking the supporting insulator.  Both bolts were then re-tightened, and resistance was checked to be about the same as achieved during the previous loosening / tightening attempt (step 2 above).

To tighten the bolts in all cases: the air ratchet was used first to turn the bolts "air tight" (air pedal only, no manual force) and then with the air pedal held down, manual torque was applied to turn no more than 1/8th of a turn.

  530   Friday, October 25, 2013, 14:09 Travis CaveSouth Hot-CellStandard OperationTM4Ta#41Target conductance

Anders Mjos wrote:

The conductance check on the electrical check was found to be outside of accepted values for the TBHT at 7.0 mOhm. A successful attempt to reduce the conductance was made by re-tightening the bolts on the TGHT legs in the SHC. Grant operated the manipulator and torqued the bolts to about 1/8 of a turn with the air ratchet. The conductance across the TGHT (A-B) could be improved from 7.0 mOhm to 6.2 mOhm by re-tightening the bolts. The value is still somewhat higher than usual, but was deemed to be acceptable. Measurements attached.

 The full electrical check was done on October 25th 2013. The results are in the attached PDF. The higher value of the conductance was dealt with see Anders Mjos elog entry for those details.

Attachment 1: TM#4_Ta#41_elec_test_SHC.PDF
TM#4_Ta#41_elec_test_SHC.PDF
  33   Monday, October 03, 2011, 11:54 chad fisherSouth Hot-CellStandard OperationTM1UCx#2 - TaC#1Target change UCx#2-TaC#1

UCx#2 has been removed from Tm1 and put in a bucket with a slow argon feed and a lid placed lossely on top.

 

TaC#1 ITW has been installed and is awaiting testing at the cell.

  2712   Wednesday, November 06, 2024, 08:29 Aaron TamSouth Hot-CellStandard OperationTM4TiC#9Target and Parasitic assemblies removal from TiC#9

November 5, 2024 - Aaron Tam

TiC#9 HP-SIS removed from TM4

  • Top left fixing bolt shows signs of heating on it (Comparison photos attached Bolt_profile.jfif  & Bolt_Tops.jfif)
  • Location and orientation of darker bolt (Darker_bolt.jfif)

Parasitic Targets Removed

  • Left target has residue left from ablation 

See photos attached for detail 

Attachment 1: Target_first_look.jfif
Attachment 2: Target_first_look_ETTR.jfif
Attachment 3: Inside_Panel.jfif
Attachment 4: Darker_bolt.jfif
Attachment 5: VCR_and_conductor_bolts_removed.jfif
Attachment 6: Top.jfif
Attachment 7: target_left.jfif
Attachment 8: Right.jfif
Attachment 9: Bottom.jfif
Attachment 10: Parasitic_Target_right.jfif
Attachment 11: Parasitic_Target_right_(2).jfif
Attachment 12: Left_side_without_parasitic.jfif
Attachment 13: Back_of_target_left.jfif
Attachment 14: Back_of_target_right.jfif
Attachment 15: Extraction_electrode.jfif
Attachment 16: Bolt_profile.jfif
Attachment 17: Bolt_Tops.jfif
  2676   Tuesday, September 10, 2024, 12:41 Aaron TamSouth Hot-CellStandard OperationTM4TiC#9Target TiC#9 HP-SIS installed onto TM4

September 9, 2024 - Aaron Tam 

  • Water from waterline found puddled on source-tray and containment box. 
  • Water was wiped up as much as possible, but likely still in containment box 
  • leaving to dry overnight
  • Target inserted into Hotcell with nuts for the parasitic target. 4/4 socket nuts installed on upstream flange, and 3/4 installed on downstream flange

September 10, 2024 - Aaron Tam

  • TiC#9 HP-SIS installed onto TM4 
  • Leak check passed after retightening VCR joint
  • Target Electrode Conductor screws torqued to 130 inch-lbs 
  • Electrical test passed 
  • Containment box cover reinstalled

Photos attached

Attachment 1: 089c5872-091d-484b-9b9c-dda8444b217b.jfif
Attachment 2: 566cae27-5562-4934-b23a-5c99af810900.jfif
Attachment 3: cc853ae8-5896-46f3-9f21-f6ede8c82626.jfif
Attachment 4: ffdf443c-2656-499a-9d0a-01ddef2f954a.jfif
  2664   Friday, August 16, 2024, 15:32 Aaron TamSouth Hot-CellStandard OperationTM4Ta#68 LP-SISTarget Ta#68 loaded onto TM4

 Target Ta#68 loaded onto TM4 

-leak check passed

-Target electrode conductor screws torqued to 130 in-lbs

-electrical check passed

Containment box cover re-installed 

photo attached 

Attachment 1: Ta-68_Installed.jfif
  2697   Tuesday, October 01, 2024, 12:40 Aaron TamSouth Hot-CellStandard OperationTM2Ta#67Target Ta#67 Removed from TM2

 October 1, 2024 - Aaron Tam 

Ta#67 LP-SIS removed from TM2

Ta#67 is sitting in SHC awaiting PIE 

TM2 Containment Box Cover has not been reinstalled 

Photos of target removal and module attached 

Attachment 1: Containment_Box.jfif
Attachment 2: Containment_Box_Cover_Internal.jfif
Attachment 3: Target_Fasteners_on.jfif
Attachment 4: Target_Fasteners_off.jfif
Attachment 5: Service_Tray_no_Target.jfif
Attachment 6: Ta#67_Left.jfif
Attachment 7: Ta#67_Right.jfif
Attachment 8: Ta#67_Top.jfif
Attachment 9: Ta#67_Bottom.jfif
  2655   Monday, August 12, 2024, 15:55 Aaron TamSouth Hot-CellStandard OperationTM2Ta#67 LP-SISTarget Loading

 Ta#67 Target loaded onto TM2

Leak check passed

Electrical test passed after loosening off target electrode conductor screws, and torqueing by feel 

 

ELOG V2.9.2-2455