2257
|
Friday, October 08, 2021, 11:19 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#35 | TM4 IGLIS target electrical tests | the tests were done when TM4 was
on NHC. see attached photos please. |
|
|
2258
|
Friday, October 08, 2021, 12:39 |
Frank Song | ITE | Standard Operation | TM4 | UCx#35 | Module Connection | the module with target UC#35 was
connected in ITE and being pumped down. |
|
|
2260
|
Tuesday, October 26, 2021, 11:01 |
Frank Song | ITE | Standard Operation | TM4 | UCx#35 | shielding blocks transfer | the five shielding blocks have been
moved from ITW to ITE. |
|
|
2273
|
Tuesday, November 23, 2021, 10:46 |
Frank Song | ITE | Standard Operation | TM4 | UCx#35 | module disconnection | the TM4 with UCx#35 was disconnected
in ITE. |
|
|
2302
|
Thursday, February 10, 2022, 11:45 |
David Wang | Spent Target Vault | Standard Operation | | UCx#33. | Spent target UCx #33 has been repacked with a new pail and lid in NHC. | Spent target UCx #33 has been repacked
with a new pail and lid in NHC. Old pail
#255. New pail # 267. Location: Vault slot |
|
|
2118
|
Friday, July 03, 2020, 13:23 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx#30 | TM4 UCx#30 Electrical check and HS leak check | Electrical and leak check are good. See
attachment. |
|
|
56
|
Friday, November 18, 2011, 09:44 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UCx#3 | Electrical check | Electrical checks of TM#1 with UCx#3 have
been completed. They all appear to be with
in operational range. All megger checks were |
|
|
57
|
Friday, November 18, 2011, 09:56 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#3 | UCx#3 Installation | UCx#3 has been installed on TM1.
Leak check also complete.
Base Leak Rate 0.0 x 10-9 |
|
|
58
|
Friday, November 18, 2011, 11:09 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UCx#3 | Module move | TM#1 with UCx#3 has been moved from the
south hot cell to the conditioning station.
Move went well. |
|
|
62
|
Thursday, November 24, 2011, 10:39 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#3 | Module move | TM#1 with UCx#3 moved from conditioning
station to west target station. Move went
well. |
|
|
63
|
Thursday, November 24, 2011, 10:40 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#3 | Module move | TM#1 with UCx#3 moved from the conditioning
station to the west target station. |
|
|
73
|
Monday, March 12, 2012, 09:19 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UCx#3 | module move | TM#1 with UC#3 was moved from the west
maa to the south hot cell, move went well |
|
|
76
|
Tuesday, March 13, 2012, 09:42 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#3 | UCx#3 Autopsy | An autopsy was performed on UCx#3 yesterday
afternoon. This autopsy followed the plan
written by Anders. Indeed, both sides of |
|
|
77
|
Tuesday, March 13, 2012, 09:43 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#3 | UCx#3 to spent vault | UCx#3 was packaged into a spent can, double
bagged and the bag and cans filled with argon
as much as possible. Lid was attached and |
|
|
78
|
Tuesday, March 13, 2012, 12:24 |
Anders Mjos | South Hot-Cell | Standard Operation | TM1 | UCx#3 | UCx#3 Autopsy |
|
|
|
2059
|
Wednesday, February 05, 2020, 08:22 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#29 | UCx#29 removed | UCx#29 has been removed from TM$ and placed
in a pail backfilled with argon until it
can be moved to the storage vault. |
|
|
2012
|
Wednesday, October 23, 2019, 07:58 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#28 | UCx#28 Removed | UCx#28 has been removed from TM4. Guard
screws on 5(10) pin connector had to be removed
to get the connector to un-seat properly |
|
|
1976
|
Thursday, September 05, 2019, 11:37 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#27 | UCx#27 install | Dummy Ta target has been removed from TM4
and UCx#27 installed |
|
|
1977
|
Thursday, September 05, 2019, 14:18 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | UCx#27 | TM4 Move | TM4 with UCx#27 target has been moved from
the South Hot-Cell to the Conditioning Station.
|
|
|
1603
|
Monday, August 28, 2017, 12:07 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#21 | Ta#52 removed UCx#21 installed | Ta#52 has been removed from TM$ and UCx#21
installed with new mounting and high current
hardware. High current fasteners torqued |
|