Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2260
Entry time:
Tuesday, October 26, 2021, 11:01
Author:
Frank Song
Category:
ITE
Type:
Standard Operation
Module:
TM4
Target/Number:
UCx#35
Subject:
shielding blocks transfer
the five shielding blocks have been moved from ITW to ITE.
ELOG V2.9.2-2455