Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2118     Entry time: Friday, July 03, 2020, 13:23
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: UCx#30 
Subject: TM4 UCx#30 Electrical check and HS leak check 

Electrical and leak check are good. See attachment.

Attachment 1: TM4_UCx30_elctrical_and_leak_check_at_SHC..pdf  184 kB  | Show | Hide all
ELOG V2.9.2-2455