Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1976     Entry time: Thursday, September 05, 2019, 11:37
Author: chad fisher 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: UCx#27 
Subject: UCx#27 install 

Dummy Ta target has been removed from TM4 and UCx#27 installed

ELOG V2.9.2-2455