Entry  Friday, October 08, 2021, 11:19, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#35, TM4 IGLIS target electrical tests IMG_3739.jpgIMG_3740.jpg
 the tests were done when TM4 was on NHC. see attached photos please.
Entry  Friday, October 08, 2021, 12:39, Frank Song, ITE, Standard Operation, TM4, UCx#35, Module Connection IMG_3742.jpgIMG_3741.jpgIMG_3743.jpgIMG_3744.jpg
 the module with target UC#35 was connected in ITE and being pumped down.
Entry  Tuesday, October 26, 2021, 11:01, Frank Song, ITE, Standard Operation, TM4, UCx#35, shielding blocks transfer 
 the five shielding blocks have been moved from ITW to ITE. 
Entry  Tuesday, November 23, 2021, 10:46, Frank Song, ITE, Standard Operation, TM4, UCx#35, module disconnection IMG_4456_(2).JPG
 the TM4 with UCx#35 was disconnected in ITE.
Entry  Thursday, February 10, 2022, 11:45, David Wang, Spent Target Vault, Standard Operation, , UCx#33., Spent target UCx #33 has been repacked with a new pail and lid in NHC.  
Spent target UCx #33 has been repacked with a new pail and lid in NHC. Old pail #255. New pail # 267. Location: Vault slot 1C.  it is an investigation
job for  a possible leak pail in vault.   
Entry  Friday, July 03, 2020, 13:23, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#30, TM4 UCx#30 Electrical check and HS leak check TM4_UCx30_elctrical_and_leak_check_at_SHC..pdf
Electrical and leak check are good. See attachment. 
Entry  Friday, November 18, 2011, 09:44, Travis Cave, South Hot-Cell, Standard Operation, TM1, UCx#3, Electrical check ITW_UC#3_Elec_check.PDF
Electrical checks of TM#1 with UCx#3 have been completed. They all appear to be with in operational range. All megger checks were done at 500 volts.
See attached file for details.
Entry  Friday, November 18, 2011, 09:56, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx#3, UCx#3 Installation 
UCx#3 has been installed on TM1.
Leak check also complete.
Base Leak Rate 0.0 x 10-9
Entry  Friday, November 18, 2011, 11:09, Travis Cave, Conditioning Station, Standard Operation, TM1, UCx#3, Module move 
TM#1 with UCx#3 has been moved from the south hot cell to the conditioning station. Move went well.
Entry  Thursday, November 24, 2011, 10:39, Travis Cave, ITW, Standard Operation, TM1, UCx#3, Module move 
TM#1 with UCx#3 moved from conditioning station to west target station. Move went well.
Entry  Thursday, November 24, 2011, 10:40, Travis Cave, ITW, Standard Operation, TM1, UCx#3, Module move 
TM#1 with UCx#3 moved from the conditioning station to the west target station.
Entry  Monday, March 12, 2012, 09:19, Travis Cave, South Hot-Cell, Standard Operation, TM1, UCx#3, module move 
TM#1 with UC#3 was moved from the west maa to the south hot cell, move went well
Entry  Tuesday, March 13, 2012, 09:42, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx#3, UCx#3 Autopsy 
An autopsy was performed on UCx#3 yesterday afternoon. This autopsy followed the plan written by Anders. Indeed, both sides of the target oven had seperated
from the central block.Pictures were taken by Anders and Pierre.
After the disection the target was placed back in a can under argon. Any small piece were placed in a zip lock bag and also put in the can under
Entry  Tuesday, March 13, 2012, 09:43, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx#3, UCx#3 to spent vault Vault_Storage_March_13_2012.pdf
UCx#3 was packaged into a spent can, double bagged and the bag and cans filled with argon as much as possible. Lid was attached and can moved to the
storage vault. The target was placed in in Pail 93, and placed into slot 1C of the vault, it was 11.7mSv/hr when removed from the south hot cell. See attached
file for latest vault details
    Reply  Tuesday, March 13, 2012, 12:24, Anders Mjos, South Hot-Cell, Standard Operation, TM1, UCx#3, UCx#3 Autopsy Inspection_of_UCx#3_in_the_South_Hot_Cell.docx


    
        
            chad fisher wrote:
        
        
            
            An autopsy was performed on UCx#3 yesterday afternoon. This autopsy followed the plan written by Anders.
Entry  Wednesday, February 05, 2020, 08:22, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#29, UCx#29 removed 
UCx#29 has been removed from TM$ and placed in a pail backfilled with argon until it can be moved to the storage vault.
Entry  Wednesday, October 23, 2019, 07:58, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#28, UCx#28 Removed 
UCx#28 has been removed from TM4. Guard screws on 5(10) pin connector had to be removed to get the connector to un-seat properly for removal.
Entry  Thursday, September 05, 2019, 11:37, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#27, UCx#27 install 
Dummy Ta target has been removed from TM4 and UCx#27 installed
Entry  Thursday, September 05, 2019, 14:18, Adam Newsome, South Hot-Cell, Standard Operation, TM4, UCx#27, TM4 Move 
TM4 with UCx#27 target has been moved from the South Hot-Cell to the Conditioning Station. 
Entry  Monday, August 28, 2017, 12:07, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#21, Ta#52 removed UCx#21 installed 
Ta#52 has been removed from TM$ and UCx#21 installed with new mounting and high current hardware. High current fasteners torqued to 130 in lbs.