ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
2257
|
Friday, October 08, 2021, 11:19 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#35 | TM4 IGLIS target electrical tests |
the tests were done when TM4 was on NHC. see attached photos please. |
Attachment 1: IMG_3739.jpg
|
|
Attachment 2: IMG_3740.jpg
|
|
2258
|
Friday, October 08, 2021, 12:39 |
Frank Song | ITE | Standard Operation | TM4 | UCx#35 | Module Connection |
the module with target UC#35 was connected in ITE and being pumped down. |
Attachment 1: IMG_3742.jpg
|
|
Attachment 2: IMG_3741.jpg
|
|
Attachment 3: IMG_3743.jpg
|
|
Attachment 4: IMG_3744.jpg
|
|
2260
|
Tuesday, October 26, 2021, 11:01 |
Frank Song | ITE | Standard Operation | TM4 | UCx#35 | shielding blocks transfer |
the five shielding blocks have been moved from ITW to ITE. |
2273
|
Tuesday, November 23, 2021, 10:46 |
Frank Song | ITE | Standard Operation | TM4 | UCx#35 | module disconnection |
the TM4 with UCx#35 was disconnected in ITE. |
Attachment 1: IMG_4456_(2).JPG
|
|
2302
|
Thursday, February 10, 2022, 11:45 |
David Wang | Spent Target Vault | Standard Operation | | UCx#33. | Spent target UCx #33 has been repacked with a new pail and lid in NHC. |
Spent target UCx #33 has been repacked with a new pail and lid in NHC. Old pail #255. New pail # 267. Location: Vault slot 1C. it is an investigation job for a possible leak pail in vault. |
2118
|
Friday, July 03, 2020, 13:23 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx#30 | TM4 UCx#30 Electrical check and HS leak check |
Electrical and leak check are good. See attachment. |
Attachment 1: TM4_UCx30_elctrical_and_leak_check_at_SHC..pdf
|
|
56
|
Friday, November 18, 2011, 09:44 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UCx#3 | Electrical check |
Electrical checks of TM#1 with UCx#3 have been completed. They all appear to be with in operational range. All megger checks were done at 500 volts. See attached file for details. |
Attachment 1: ITW_UC#3_Elec_check.PDF
|
|
57
|
Friday, November 18, 2011, 09:56 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#3 | UCx#3 Installation |
UCx#3 has been installed on TM1.
Leak check also complete.
Base Leak Rate 0.0 x 10-9
Pressure 0.0x10-4
Two checks on upper heat shield joint - no response (2 sec spray/check)
Two checks on lower heat shield joint - no response(2 sec spray /check)
10 sec flood of all heat shield joints - no response
Electrical check coomplete. |
58
|
Friday, November 18, 2011, 11:09 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UCx#3 | Module move |
TM#1 with UCx#3 has been moved from the south hot cell to the conditioning station. Move went well. |
62
|
Thursday, November 24, 2011, 10:39 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#3 | Module move |
TM#1 with UCx#3 moved from conditioning station to west target station. Move went well. |
63
|
Thursday, November 24, 2011, 10:40 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#3 | Module move |
TM#1 with UCx#3 moved from the conditioning station to the west target station. |
73
|
Monday, March 12, 2012, 09:19 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UCx#3 | module move |
TM#1 with UC#3 was moved from the west maa to the south hot cell, move went well |
76
|
Tuesday, March 13, 2012, 09:42 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#3 | UCx#3 Autopsy |
An autopsy was performed on UCx#3 yesterday afternoon. This autopsy followed the plan written by Anders. Indeed, both sides of the target oven had seperated from the central block.Pictures were taken by Anders and Pierre.
After the disection the target was placed back in a can under argon. Any small piece were placed in a zip lock bag and also put in the can under argon. |
77
|
Tuesday, March 13, 2012, 09:43 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#3 | UCx#3 to spent vault |
UCx#3 was packaged into a spent can, double bagged and the bag and cans filled with argon as much as possible. Lid was attached and can moved to the storage vault. The target was placed in in Pail 93, and placed into slot 1C of the vault, it was 11.7mSv/hr when removed from the south hot cell. See attached file for latest vault details |
Attachment 1: Vault_Storage_March_13_2012.pdf
|
|
78
|
Tuesday, March 13, 2012, 12:24 |
Anders Mjos | South Hot-Cell | Standard Operation | TM1 | UCx#3 | UCx#3 Autopsy |
chad fisher wrote: |
An autopsy was performed on UCx#3 yesterday afternoon. This autopsy followed the plan written by Anders. Indeed, both sides of the target oven had seperated from the central block.Pictures were taken by Anders and Pierre.
After the disection the target was placed back in a can under argon. Any small piece were placed in a zip lock bag and also put in the can under argon.
|
Pictures are available on DocuShare:
https://documents.triumf.ca/docushare/dsweb/View/Collection-8189
ISAC e-log entries:
https://web.accel.triumf.ca/isac_elog/Elog_shift_view.pl?shiftid=10803
See attachment for autopsy plan.
|
Attachment 1: Inspection_of_UCx#3_in_the_South_Hot_Cell.docx
|
2059
|
Wednesday, February 05, 2020, 08:22 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#29 | UCx#29 removed |
UCx#29 has been removed from TM$ and placed in a pail backfilled with argon until it can be moved to the storage vault. |
2012
|
Wednesday, October 23, 2019, 07:58 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#28 | UCx#28 Removed |
UCx#28 has been removed from TM4. Guard screws on 5(10) pin connector had to be removed to get the connector to un-seat properly for removal. |
1976
|
Thursday, September 05, 2019, 11:37 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#27 | UCx#27 install |
Dummy Ta target has been removed from TM4 and UCx#27 installed |
1977
|
Thursday, September 05, 2019, 14:18 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | UCx#27 | TM4 Move |
TM4 with UCx#27 target has been moved from the South Hot-Cell to the Conditioning Station. |
1603
|
Monday, August 28, 2017, 12:07 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#21 | Ta#52 removed UCx#21 installed |
Ta#52 has been removed from TM$ and UCx#21 installed with new mounting and high current hardware. High current fasteners torqued to 130 in lbs. |