Friday, September 05, 2014, 07:15, David Wang, Conditioning Station, Standard Operation, TM1, , helium pressure test on TM1 HS water line at CS.
|
Helium pressure test on TM1 HS water line at CS is done. 80psi helium with LD 0.0xE-9 atm.cc/sec. 3 minutes test and no response on LD. The line is leak tight. |
Tuesday, February 25, 2014, 10:00, David Wang, Conditioning Station, Repair, TM2, , helium pressure test on TM2 tube heater (+) water line with blank off(C-seal) installed on WB. 10x
|
I did the helium pressure test on TM2 tube heater (+) water line with blank off(C-seal) installed on water block at CS.The leak detector was hooked directly to the top of the module this time. So base leak rate and base pressure were at the bottom scale on LD. 30 -80 psi helium was applied to the D lines(both side) with10 psi increasing each time. There is no any tiny response hasbeen found during the test. The lines are perfectly sealed. Also i sprayed the helium on the top of the service cap .All air to vacuum seals on the top are good either. See attachment pictures. |
Wednesday, November 29, 2023, 12:45, Carla Babcock, ITE, Standard Operation, , , gas lines pumped down
|
Pumped down the gas lines in ITE on Tuesday Nov. 28 2023 and opened the CF4 bottle valves. Missed the small section between the regulator and SV2 though, so will probably redo it.
Pumped down again on Dec. 12 2023. Was taking a long time so might not be as good as earlier. Maybe there is a leak in there... |
Tuesday, May 30, 2023, 12:30, Frank Song, ITW, Standard Operation, TM2, TiC#6, gas lines pump out in ITW Faraday Cage
|
Gas lines pumped down at electric room for TM2 at ITW is done, leak rate 0.0e -8 <1.0e -3 T P pressure |
Tuesday, May 30, 2023, 12:23, Frank Song, ITE, Standard Operation, TM4, TiC#5, gas lines pump out in ITE Faraday Cage
|
argon is being supplied at 6 psi to TM4. |
Tuesday, December 03, 2013, 10:35, Travis Cave, ITW, Standard Operation, , , fields above and in the target station with blocks off
|
The blocks have been removed from the west target station. The fields at the top of the target pit at the railing at waist level is about 80uSv/hr, Turbo pumps are about 805uSv/hr, backing lines for the turbos about a 1mSv/hr and the average field in the area of work down in the pit is about 600 to 750uSv/hr. The proton beam went off at 10:45 on December 2nd, these measurements were done at 09:00 on December 3rd.
Another set of field measurement was done at the west target station. At the top of the west target station at the railing the field ranged from 50 to 70 uSv/hr. The turbo pumps had field of about 650uSv/hr, the area over the dump was about 750uSv/hr, the area over the HV cover and the south side was about 450uSv/hr. These measurements were done at 13:15 on December 3rd. |
Tuesday, March 11, 2014, 10:47, Travis Cave, ITE, Repair, , , entrance module move
|
ITE entrance module has been moved from the east station to the south east silo. |
Monday, April 14, 2014, 11:57, Travis Cave, ITE, Standard Operation, , , entrance module move
|
The East Entrance module has been moved from the south west silo to the east target station. The move went well. |
Wednesday, July 30, 2014, 11:51, Travis Cave, Conditioning Station, Maintenance, , , entrance module move
|
ITE Entrance module has been moved from the east station to the conditioning station. |
Tuesday, September 17, 2019, 07:37, Carla Babcock, ITE, Development, TM2, ZrC#8, end of run HV investigations
|
Ramping up HV to ~30kV, encountered problems and had to drop back to 28kV. No response on IG1 or anything else during sparks. Lots of charging-type behaviour on the bias current. Protons at 55uA
Tuesday, September 17, 2019, 02:02 : 15 mins with only 1 spark at 30kV so increased the bias
Tuesday, September 17, 2019, 02:31 : 32kV. Current unstable
Tuesday, September 17, 2019, 02:41 : Current continues extremely unstable but not much sparking....
Tuesday, September 17, 2019, 02:53 : Proton beam trip initially settled the bias current down, but then current began climbing pretty steeply with protons still off
Tuesday, September 17, 2019, 03:28 : Protons dropped to 40uA from 55uA, Bias current is much more stable and no sparks for 25mins
Tuesday, September 17, 2019, 03:36 : Raising voltage easy to about 33.5kV then instability and sparking similar to around 31kV at 55uA p+
Tuesday, September 17, 2019, 04:45 : Lowered protons to 25uA and no sparks though the current is not stable
More things but forgot to write them down. Spreadsheet attached. |
Monday, May 08, 2023, 10:59, Frank Song, North Hot-Cell, Standard Operation, TM4, TiC#5, electrical check/leak check
|
TM4 with target TiC#5 installed has been leak checked and electric checked on NHC. |
Tuesday, August 29, 2023, 14:32, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta#65, electrical check/leak check
|
TM4 with new target Ta#65 has been E/L checked at NHCPost. |
Tuesday, August 29, 2023, 14:32, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta#65, electrical check/leak check
|
TM4 with new target Ta#65 has been E/L checked at NHCPost. |
Wednesday, October 04, 2023, 10:41, Frank Song, South Hot-Cell, Standard Operation, TM2, Ta#66, electrical check/leak check
|
TM2 with new target Ta#66 had an electrical check and leak check on SHC. |
Wednesday, November 08, 2023, 12:14, Frank Song, South Hot-Cell, Standard Operation, TM4, UCx#43, electrical check/leak check
|
TM4 with new target UCx#43 was electrical and leak checked on SHC. |
Tuesday, April 30, 2024, 08:00, Frank Song, South Hot-Cell, Standard Operation, TM4, Lp-Febiad empty, electrical check/leak check
|
David Wang made E/L checking before module moving to ITW. read attachment pls. |
Friday, August 09, 2024, 16:15, Frank Song, South Hot-Cell, Repair, TM3, TiC#8, electrical check/leak check
|
TM3 with replaced target TiC#8 has been checked on SHC before moving to ITW. Pls see attachment |
Tuesday, August 13, 2024, 08:39, Frank Song, South Hot-Cell, Standard Operation, TM2, Ta#67, electrical check/leak check
|
TM2 with new target Ta#67 had been electric/leak checked before moving to ITE. See attachment pls. |
Friday, August 16, 2024, 13:29, Frank Song, South Hot-Cell, Standard Operation, TM4, Ta#68, electrical check/leak check
|
New target Ta#68 is installed on TM4 and be leak/electric checked. Pls see attachment. |
Tuesday, September 10, 2024, 12:41, Frank Song, South Hot-Cell, Standard Operation, TM4, TiC#9 , electrical check/leak check
|
TM4 with new target TiC#9 Surface installed in SHC was leak/electric checked before moving to TCS. See attached pic pls. |
|