Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2500     Entry time: Wednesday, November 08, 2023, 12:14
Author: Frank Song 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: UCx#43 
Subject: electrical check/leak check 

 TM4 with new target UCx#43 was electrical and leak checked on SHC.

Attachment 1: TM4_electric_and_leak_checked_after_UCx#43_installed_2023-11-08.pdf  79 kB  | Show | Hide all
ELOG V2.9.2-2455