Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2573     Entry time: Tuesday, April 30, 2024, 08:00
Author: Frank Song 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: Lp-Febiad empty 
Subject: electrical check/leak check 

 David Wang made E/L checking before module moving to ITW. read attachment pls.

Attachment 1: TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf  110 kB  | Show | Hide all
ELOG V2.9.2-2455