Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 648     Entry time: Monday, April 14, 2014, 11:57
Author: Travis Cave 
Category: ITE 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: entrance module move 

The East Entrance module has been moved from the south west silo to the east target station. The move went well.

ELOG V2.9.2-2455