741
|
Friday, September 05, 2014, 07:15 |
David Wang | Conditioning Station | Standard Operation | TM1 | | helium pressure test on TM1 HS water line at CS. | Helium pressure test on TM1 HS water line
at CS is done. 80psi helium with LD 0.0xE-9
atm.cc/sec. 3 minutes test and no response |
|
609
|
Tuesday, February 25, 2014, 10:00 |
David Wang | Conditioning Station | Repair | TM2 | | helium pressure test on TM2 tube heater (+) water line with blank off(C-seal) installed on WB. | I did the helium pressure test
on TM2 tube heater (+) water line with
blank off(C-seal) installed on water |
10x |
2508
|
Wednesday, November 29, 2023, 12:45 |
Carla Babcock | ITE | Standard Operation | | | gas lines pumped down | Pumped down the gas lines in ITE on Tuesday
Nov. 28 2023 and opened the CF4 bottle valves.
Missed the small section between the regulator |
|
2449
|
Tuesday, May 30, 2023, 12:30 |
Frank Song | ITW | Standard Operation | TM2 | TiC#6 | gas lines pump out in ITW Faraday Cage | Gas lines pumped |
|
2448
|
Tuesday, May 30, 2023, 12:23 |
Frank Song | ITE | Standard Operation | TM4 | TiC#5 | gas lines pump out in ITE Faraday Cage | argon is being supplied at 6 psi to TM4. |
|
564
|
Tuesday, December 03, 2013, 10:35 |
Travis Cave | ITW | Standard Operation | | | fields above and in the target station with blocks off | The blocks have been removed from the west
target station. The fields at the top of
the target pit at the railing at waist level |
|
618
|
Tuesday, March 11, 2014, 10:47 |
Travis Cave | ITE | Repair | | | entrance module move | ITE entrance module has been moved from
the east station to the south east silo. |
|
648
|
Monday, April 14, 2014, 11:57 |
Travis Cave | ITE | Standard Operation | | | entrance module move | The East Entrance module has been moved
from the south west silo to the east target
station. The move went well. |
|
719
|
Wednesday, July 30, 2014, 11:51 |
Travis Cave | Conditioning Station | Maintenance | | | entrance module move | ITE Entrance module has been moved from
the east station to the conditioning station. |
|
1986
|
Tuesday, September 17, 2019, 07:37 |
Carla Babcock | ITE | Development | TM2 | ZrC#8 | end of run HV investigations | Ramping up HV to ~30kV, encountered problems
and had to drop back to 28kV. No response
on IG1 or anything else during sparks. Lots |
|
2439
|
Monday, May 08, 2023, 10:59 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | TiC#5 | electrical check/leak check | TM4 with target TiC#5 installed has
been leak checked and electric checked on
NHC. |
|
2485
|
Tuesday, August 29, 2023, 14:32 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta#65 | electrical check/leak check | TM4 with new target Ta#65 has been
E/L checked at NHCPost. |
|
2486
|
Tuesday, August 29, 2023, 14:32 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta#65 | electrical check/leak check | TM4 with new target Ta#65 has been
E/L checked at NHCPost. |
|
2492
|
Wednesday, October 04, 2023, 10:41 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Ta#66 | electrical check/leak check | TM2 with new target Ta#66 had an
electrical check and leak check on SHC. |
|
2500
|
Wednesday, November 08, 2023, 12:14 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | UCx#43 | electrical check/leak check | TM4 with new target UCx#43 was electrical
and leak checked on SHC. |
|
2573
|
Tuesday, April 30, 2024, 08:00 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Lp-Febiad empty | electrical check/leak check | David Wang made E/L checking before
module moving to ITW. read attachment pls. |
|
2650
|
Friday, August 09, 2024, 16:15 |
Frank Song | South Hot-Cell | Repair | TM3 | TiC#8 | electrical check/leak check | TM3 with replaced target TiC#8 has
been checked on SHC before moving to ITW.
Pls see attachment |
|
2656
|
Tuesday, August 13, 2024, 08:39 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Ta#67 | electrical check/leak check | TM2 with new target Ta#67 had been
electric/leak checked before moving to ITE.
See attachment pls. |
|
2662
|
Friday, August 16, 2024, 13:29 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta#68 | electrical check/leak check | New target Ta#68 is installed on
TM4 and be leak/electric checked. Pls see
attachment. |
|
2677
|
Tuesday, September 10, 2024, 12:41 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | TiC#9 | electrical check/leak check | TM4 with new target TiC#9 Surface
installed in SHC was leak/electric checked
before moving to TCS. See attached pic pls. |
|