ID Date Author Category Type Module Target/Number Subjectdown
  618   Tuesday, March 11, 2014, 10:47 Travis CaveITERepair  entrance module move

ITE entrance module has been moved from the east station to the south east silo.

  648   Monday, April 14, 2014, 11:57 Travis CaveITEStandard Operation  entrance module move

The East Entrance module has been moved from the south west silo to the east target station. The move went well.

  719   Wednesday, July 30, 2014, 11:51 Travis CaveConditioning StationMaintenance  entrance module move

ITE Entrance module has been moved from the east station to the conditioning station.

  1986   Tuesday, September 17, 2019, 07:37 Carla BabcockITEDevelopmentTM2ZrC#8end of run HV investigations

Ramping up HV to ~30kV, encountered problems and had to drop back to 28kV. No response on IG1 or anything else during sparks. Lots of charging-type behaviour on the bias current. Protons at 55uA

Tuesday, September 17, 2019, 02:02 : 15 mins with only 1 spark at 30kV so increased the bias

Tuesday, September 17, 2019, 02:31 : 32kV. Current unstable

Tuesday, September 17, 2019, 02:41 : Current continues extremely unstable but not much sparking....

Tuesday, September 17, 2019, 02:53 : Proton beam trip initially settled the bias current down, but then current began climbing pretty steeply with protons still off

Tuesday, September 17, 2019, 03:28 : Protons dropped to 40uA from 55uA, Bias current is much more stable and no sparks for 25mins

Tuesday, September 17, 2019, 03:36 : Raising voltage easy to about 33.5kV then instability and sparking similar to around 31kV at 55uA p+

Tuesday, September 17, 2019, 04:45 : Lowered protons to 25uA and no sparks though the current is not stable

More things but forgot to write them down. Spreadsheet attached.

Attachment 1: HVtests_TM2_Sept172019.xlsx
  2439   Monday, May 08, 2023, 10:59 Frank SongNorth Hot-CellStandard OperationTM4TiC#5electrical check/leak check

 TM4 with target TiC#5 installed has been leak checked and electric checked on NHC.

Attachment 1: TM4_with_TiC#5_20230508.png
TM4_with_TiC#5_20230508.png
  2485   Tuesday, August 29, 2023, 14:32 Frank SongNorth Hot-CellStandard OperationTM4Ta#65electrical check/leak check

 TM4 with new target Ta#65 has been E/L checked at NHCPost.

Attachment 1: TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
  2486   Tuesday, August 29, 2023, 14:32 Frank SongNorth Hot-CellStandard OperationTM4Ta#65electrical check/leak check

 TM4 with new target Ta#65 has been E/L checked at NHCPost.

Attachment 1: TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
  2492   Wednesday, October 04, 2023, 10:41 Frank SongSouth Hot-CellStandard OperationTM2Ta#66electrical check/leak check

 TM2 with new target Ta#66 had an electrical check and leak check on SHC. 

Attachment 1: TM2_with_Ta#66_electical_and_leak_check_in_SHC_2023-10-04.pdf
TM2_with_Ta#66_electical_and_leak_check_in_SHC_2023-10-04.pdf
  2500   Wednesday, November 08, 2023, 12:14 Frank SongSouth Hot-CellStandard OperationTM4UCx#43electrical check/leak check

 TM4 with new target UCx#43 was electrical and leak checked on SHC.

Attachment 1: TM4_electric_and_leak_checked_after_UCx#43_installed_2023-11-08.pdf
TM4_electric_and_leak_checked_after_UCx#43_installed_2023-11-08.pdf
  2573   Tuesday, April 30, 2024, 08:00 Frank SongSouth Hot-CellStandard OperationTM4Lp-Febiad emptyelectrical check/leak check

 David Wang made E/L checking before module moving to ITW. read attachment pls.

Attachment 1: TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf
TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf
  2650   Friday, August 09, 2024, 16:15 Frank SongSouth Hot-CellRepairTM3TiC#8electrical check/leak check

 TM3 with replaced target TiC#8 has been checked on SHC before moving to ITW. Pls see attachment

Attachment 1: electrical_and_leak_check_of_TM3_with_new_target_TiC#8_replaced_at_SHC_20240809.pdf
electrical_and_leak_check_of_TM3_with_new_target_TiC#8_replaced_at_SHC_20240809.pdf
  2656   Tuesday, August 13, 2024, 08:39 Frank SongSouth Hot-CellStandard OperationTM2Ta#67electrical check/leak check

 TM2 with new target Ta#67 had been electric/leak checked before moving to ITE. See attachment pls.

Attachment 1: TM2_with_Ta@67_electric_and_leak_check_on_SHC.pdf
TM2_with_Ta@67_electric_and_leak_check_on_SHC.pdf
  2662   Friday, August 16, 2024, 13:29 Frank SongSouth Hot-CellStandard OperationTM4Ta#68electrical check/leak check

 New target Ta#68 is installed on TM4 and be leak/electric checked. Pls see attachment.

Attachment 1: TM4_with_Ta#68_electric_and_leak_check_on_SHC_2028-08-16.pdf
TM4_with_Ta#68_electric_and_leak_check_on_SHC_2028-08-16.pdf
  2677   Tuesday, September 10, 2024, 12:41 Frank SongSouth Hot-CellStandard OperationTM4TiC#9 electrical check/leak check

 TM4 with new target TiC#9 Surface installed in SHC was leak/electric checked before moving to TCS. See attached pic pls.

Attachment 1: TM4_with_TiC#9_Surface_electric(leak)_cheak_on_SHC_2024-09-10.pdf
TM4_with_TiC#9_Surface_electric(leak)_cheak_on_SHC_2024-09-10.pdf
  2721   Tuesday, November 26, 2024, 13:03 Frank SongSouth Hot-CellStandard OperationTM3UCx#47electrical check/leak check

An electrical check and leak check had been done after new target UCx47 was installed on TM3 in SHC. see attachment pls.

Attachment 1: TM3_with_new_target_UCx#47_electrical_check_on_SHC_2024-11-26.pdf
TM3_with_new_target_UCx#47_electrical_check_on_SHC_2024-11-26.pdf
  2498   Tuesday, November 07, 2023, 13:42 Frank SongSouth Hot-CellStandard OperationTM4Ta#65electrical check with the spent target

TM4 with spent target Ta#65 was electrical checked right after being moved to SHC. 

Attachment 1: TM4_with_Spent_Target_Ta#65_electrical_check_on_SHC_2023-11-07.pdf
TM4_with_Spent_Target_Ta#65_electrical_check_on_SHC_2023-11-07.pdf
  2711   Tuesday, November 05, 2024, 11:04 Frank SongSouth Hot-CellStandard Operation TiC#9 electrical check with the spent target

 David made electrical check right after TM4 is moved from ITW to SHC. see attachment pls.

Attachment 1: Electric_Check_of_TM4_with_spent_TiC#9.pdf
Electric_Check_of_TM4_with_spent_TiC#9.pdf
  1255   Tuesday, June 07, 2016, 11:42 David WangSouth Hot-CellStandard OperationTM4Ta#47electrical check on TM4 with old Ta target at SHC.

I did an electrical check on TM4 with the old target still installed. The number is a little bit low on 500V mega check between chassis and 60KVbias which is 146Mohm. Others are good.    See attachment

I wrote all OL to 0  in attachment 1 ohmmeter check. Please See attachment 2 for correction.

Attachment 1: electrical_check_2016-06-07._TM4_with_old_Lp_Ta_target..pdf
electrical_check_2016-06-07._TM4_with_old_Lp_Ta_target..pdf
Attachment 2: electrical_check_2016-06-07._TM4_with_old_Lp_Ta_target..pdf
electrical_check_2016-06-07._TM4_with_old_Lp_Ta_target..pdf
  895   Wednesday, April 22, 2015, 11:05 David WangConditioning StationStandard OperationTM1 electrical check on TM1 at CS under vacuum

I did an electrical check on TM1 at CS. The resistance check:A-B 3.918m ohm, A-C 5.905m ohm,A-D 4.070m ohm,B-C5.462m ohm,B-D3.633m ohm. They are very close to the check we did in SHC. The only unusual thing I found during the check is the ohmmeter reading between A and 60 KV common (6.2K )and the Megga reading between them  at 250 V which is 0. I repeated 4 times and always got the same readings. However, after so many times check, the Megga reading between A and 60KV   suddenly went back to normal(300 M at 250V) at the final check.  And,it stays at 300M now.  All other measurements are same as we did at SHC before.         

  2596   Wednesday, May 22, 2024, 12:43 David WangSouth Hot-CellStandard OperationTM4UCx#45electrical check and leak check were done on TM4 UCx#45 target at SHC.

electrical check and leak check were done on TM4 UCx#45 target at SHC.  everything is ok. See attachment

helium pressure test on TM4 HS line at TCS is done.   No leak.

Attachment 1: Scanned_from_a_Xerox_Multifunction_Printer.pdf
Scanned_from_a_Xerox_Multifunction_Printer.pdf