618
|
Tuesday, March 11, 2014, 10:47 |
Travis Cave | ITE | Repair | | | entrance module move |
ITE entrance module has been moved from the east station to the south east silo. |
648
|
Monday, April 14, 2014, 11:57 |
Travis Cave | ITE | Standard Operation | | | entrance module move |
The East Entrance module has been moved from the south west silo to the east target station. The move went well. |
719
|
Wednesday, July 30, 2014, 11:51 |
Travis Cave | Conditioning Station | Maintenance | | | entrance module move |
ITE Entrance module has been moved from the east station to the conditioning station. |
1986
|
Tuesday, September 17, 2019, 07:37 |
Carla Babcock | ITE | Development | TM2 | ZrC#8 | end of run HV investigations |
Ramping up HV to ~30kV, encountered problems and had to drop back to 28kV. No response on IG1 or anything else during sparks. Lots of charging-type behaviour on the bias current. Protons at 55uA
Tuesday, September 17, 2019, 02:02 : 15 mins with only 1 spark at 30kV so increased the bias
Tuesday, September 17, 2019, 02:31 : 32kV. Current unstable
Tuesday, September 17, 2019, 02:41 : Current continues extremely unstable but not much sparking....
Tuesday, September 17, 2019, 02:53 : Proton beam trip initially settled the bias current down, but then current began climbing pretty steeply with protons still off
Tuesday, September 17, 2019, 03:28 : Protons dropped to 40uA from 55uA, Bias current is much more stable and no sparks for 25mins
Tuesday, September 17, 2019, 03:36 : Raising voltage easy to about 33.5kV then instability and sparking similar to around 31kV at 55uA p+
Tuesday, September 17, 2019, 04:45 : Lowered protons to 25uA and no sparks though the current is not stable
More things but forgot to write them down. Spreadsheet attached. |
Attachment 1: HVtests_TM2_Sept172019.xlsx
|
2439
|
Monday, May 08, 2023, 10:59 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | TiC#5 | electrical check/leak check |
TM4 with target TiC#5 installed has been leak checked and electric checked on NHC. |
Attachment 1: TM4_with_TiC#5_20230508.png
|
|
2485
|
Tuesday, August 29, 2023, 14:32 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta#65 | electrical check/leak check |
TM4 with new target Ta#65 has been E/L checked at NHCPost. |
Attachment 1: TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
|
|
2486
|
Tuesday, August 29, 2023, 14:32 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta#65 | electrical check/leak check |
TM4 with new target Ta#65 has been E/L checked at NHCPost. |
Attachment 1: TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
|
|
2492
|
Wednesday, October 04, 2023, 10:41 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Ta#66 | electrical check/leak check |
TM2 with new target Ta#66 had an electrical check and leak check on SHC. |
Attachment 1: TM2_with_Ta#66_electical_and_leak_check_in_SHC_2023-10-04.pdf
|
|
2500
|
Wednesday, November 08, 2023, 12:14 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | UCx#43 | electrical check/leak check |
TM4 with new target UCx#43 was electrical and leak checked on SHC. |
Attachment 1: TM4_electric_and_leak_checked_after_UCx#43_installed_2023-11-08.pdf
|
|
2573
|
Tuesday, April 30, 2024, 08:00 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Lp-Febiad empty | electrical check/leak check |
David Wang made E/L checking before module moving to ITW. read attachment pls. |
Attachment 1: TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf
|
|
2650
|
Friday, August 09, 2024, 16:15 |
Frank Song | South Hot-Cell | Repair | TM3 | TiC#8 | electrical check/leak check |
TM3 with replaced target TiC#8 has been checked on SHC before moving to ITW. Pls see attachment |
Attachment 1: electrical_and_leak_check_of_TM3_with_new_target_TiC#8_replaced_at_SHC_20240809.pdf
|
|
2656
|
Tuesday, August 13, 2024, 08:39 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Ta#67 | electrical check/leak check |
TM2 with new target Ta#67 had been electric/leak checked before moving to ITE. See attachment pls. |
Attachment 1: TM2_with_Ta@67_electric_and_leak_check_on_SHC.pdf
|
|
2662
|
Friday, August 16, 2024, 13:29 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta#68 | electrical check/leak check |
New target Ta#68 is installed on TM4 and be leak/electric checked. Pls see attachment. |
Attachment 1: TM4_with_Ta#68_electric_and_leak_check_on_SHC_2028-08-16.pdf
|
|
2677
|
Tuesday, September 10, 2024, 12:41 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | TiC#9 | electrical check/leak check |
TM4 with new target TiC#9 Surface installed in SHC was leak/electric checked before moving to TCS. See attached pic pls. |
Attachment 1: TM4_with_TiC#9_Surface_electric(leak)_cheak_on_SHC_2024-09-10.pdf
|
|
2721
|
Tuesday, November 26, 2024, 13:03 |
Frank Song | South Hot-Cell | Standard Operation | TM3 | UCx#47 | electrical check/leak check |
An electrical check and leak check had been done after new target UCx47 was installed on TM3 in SHC. see attachment pls. |
Attachment 1: TM3_with_new_target_UCx#47_electrical_check_on_SHC_2024-11-26.pdf
|
|
2498
|
Tuesday, November 07, 2023, 13:42 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta#65 | electrical check with the spent target |
TM4 with spent target Ta#65 was electrical checked right after being moved to SHC. |
Attachment 1: TM4_with_Spent_Target_Ta#65_electrical_check_on_SHC_2023-11-07.pdf
|
|
2711
|
Tuesday, November 05, 2024, 11:04 |
Frank Song | South Hot-Cell | Standard Operation | | TiC#9 | electrical check with the spent target |
David made electrical check right after TM4 is moved from ITW to SHC. see attachment pls. |
Attachment 1: Electric_Check_of_TM4_with_spent_TiC#9.pdf
|
|
1255
|
Tuesday, June 07, 2016, 11:42 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#47 | electrical check on TM4 with old Ta target at SHC. |
I did an electrical check on TM4 with the old target still installed. The number is a little bit low on 500V mega check between chassis and 60KVbias which is 146Mohm. Others are good. See attachment
I wrote all OL to 0 in attachment 1 ohmmeter check. Please See attachment 2 for correction. |
Attachment 1: electrical_check_2016-06-07._TM4_with_old_Lp_Ta_target..pdf
|
|
Attachment 2: electrical_check_2016-06-07._TM4_with_old_Lp_Ta_target..pdf
|
|
895
|
Wednesday, April 22, 2015, 11:05 |
David Wang | Conditioning Station | Standard Operation | TM1 | | electrical check on TM1 at CS under vacuum |
I did an electrical check on TM1 at CS. The resistance check:A-B 3.918m ohm, A-C 5.905m ohm,A-D 4.070m ohm,B-C5.462m ohm,B-D3.633m ohm. They are very close to the check we did in SHC. The only unusual thing I found during the check is the ohmmeter reading between A and 60 KV common (6.2K )and the Megga reading between them at 250 V which is 0. I repeated 4 times and always got the same readings. However, after so many times check, the Megga reading between A and 60KV suddenly went back to normal(300 M at 250V) at the final check. And,it stays at 300M now. All other measurements are same as we did at SHC before. |
2596
|
Wednesday, May 22, 2024, 12:43 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx#45 | electrical check and leak check were done on TM4 UCx#45 target at SHC. |
electrical check and leak check were done on TM4 UCx#45 target at SHC. everything is ok. See attachment
helium pressure test on TM4 HS line at TCS is done. No leak. |
Attachment 1: Scanned_from_a_Xerox_Multifunction_Printer.pdf
|
|