ID Date Author Category Type Module Target/Number Subjectdown
  741   Friday, September 05, 2014, 07:15 David WangConditioning StationStandard OperationTM1 helium pressure test on TM1 HS water line at CS.

Helium pressure test on TM1 HS water line at CS is done. 80psi helium with LD 0.0xE-9 atm.cc/sec. 3 minutes test and no response on LD. The line is leak tight.

  609   Tuesday, February 25, 2014, 10:00 David WangConditioning StationRepairTM2 helium pressure test on TM2 tube heater (+) water line with blank off(C-seal) installed on WB.

I did the helium pressure  test  on TM2 tube heater (+) water line  with blank off(C-seal) installed on  water block at CS.The leak detector was hooked directly to the top of the module this time. So base leak rate and base pressure were at the bottom scale on LD. 30 -80 psi helium was applied to the D lines(both side)  with10 psi   increasing each time. There is no any tiny response hasbeen found during the test. The lines are perfectly sealed. Also i sprayed the helium on the top of the service cap .All  air to vacuum seals on the top are good either. See attachment pictures.

Attachment 1: 004.JPG
004.JPG
Attachment 2: 005.JPG
005.JPG
Attachment 3: 006.JPG
006.JPG
Attachment 4: 007.JPG
007.JPG
Attachment 5: 008.JPG
008.JPG
Attachment 6: 009.JPG
009.JPG
Attachment 7: 010.JPG
010.JPG
Attachment 8: 011.JPG
011.JPG
Attachment 9: 017.JPG
017.JPG
Attachment 10: 019.JPG
019.JPG
  2508   Wednesday, November 29, 2023, 12:45 Carla BabcockITEStandard Operation  gas lines pumped down

Pumped down the gas lines in ITE on Tuesday Nov. 28 2023 and opened the CF4 bottle valves. Missed the small section between the regulator and SV2 though, so will probably redo it.

Pumped down again on Dec. 12 2023. Was taking a long time so might not be as good as earlier. Maybe there is a leak in there...

  2449   Tuesday, May 30, 2023, 12:30 Frank SongITWStandard OperationTM2TiC#6gas lines pump out in ITW Faraday Cage

 Gas lines pumped down at electric room for TM2 at ITW is done, leak rate 0.0e -8 <1.0e -3 T P pressure

Attachment 1: gas_lines_pumped_out_to_ITW.JPG
gas_lines_pumped_out_to_ITW.JPG
  2448   Tuesday, May 30, 2023, 12:23 Frank SongITEStandard OperationTM4TiC#5gas lines pump out in ITE Faraday Cage

argon is being supplied at 6 psi to TM4. 

Attachment 1: Argon_supplied_at_6psi_to_TM4_in_ITE.JPG
Argon_supplied_at_6psi_to_TM4_in_ITE.JPG
  564   Tuesday, December 03, 2013, 10:35 Travis CaveITWStandard Operation  fields above and in the target station with blocks off

The blocks have been removed from the west target station. The fields at the top of the target pit at the railing at waist level is about 80uSv/hr, Turbo pumps are about 805uSv/hr, backing lines for the turbos about a 1mSv/hr and the average field in the area of work down in the pit is about 600 to 750uSv/hr. The proton beam went off at 10:45 on December 2nd, these measurements were done at 09:00 on December 3rd.

 

Another set of field measurement was done at the west target station. At the top of the west target station at the railing the field ranged from 50 to 70 uSv/hr. The turbo pumps had field of about 650uSv/hr, the area over the dump was about 750uSv/hr, the area over the HV cover and the south side was about 450uSv/hr. These measurements were done at 13:15 on December 3rd.

  618   Tuesday, March 11, 2014, 10:47 Travis CaveITERepair  entrance module move

ITE entrance module has been moved from the east station to the south east silo.

  648   Monday, April 14, 2014, 11:57 Travis CaveITEStandard Operation  entrance module move

The East Entrance module has been moved from the south west silo to the east target station. The move went well.

  719   Wednesday, July 30, 2014, 11:51 Travis CaveConditioning StationMaintenance  entrance module move

ITE Entrance module has been moved from the east station to the conditioning station.

  1986   Tuesday, September 17, 2019, 07:37 Carla BabcockITEDevelopmentTM2ZrC#8end of run HV investigations

Ramping up HV to ~30kV, encountered problems and had to drop back to 28kV. No response on IG1 or anything else during sparks. Lots of charging-type behaviour on the bias current. Protons at 55uA

Tuesday, September 17, 2019, 02:02 : 15 mins with only 1 spark at 30kV so increased the bias

Tuesday, September 17, 2019, 02:31 : 32kV. Current unstable

Tuesday, September 17, 2019, 02:41 : Current continues extremely unstable but not much sparking....

Tuesday, September 17, 2019, 02:53 : Proton beam trip initially settled the bias current down, but then current began climbing pretty steeply with protons still off

Tuesday, September 17, 2019, 03:28 : Protons dropped to 40uA from 55uA, Bias current is much more stable and no sparks for 25mins

Tuesday, September 17, 2019, 03:36 : Raising voltage easy to about 33.5kV then instability and sparking similar to around 31kV at 55uA p+

Tuesday, September 17, 2019, 04:45 : Lowered protons to 25uA and no sparks though the current is not stable

More things but forgot to write them down. Spreadsheet attached.

Attachment 1: HVtests_TM2_Sept172019.xlsx
  2439   Monday, May 08, 2023, 10:59 Frank SongNorth Hot-CellStandard OperationTM4TiC#5electrical check/leak check

 TM4 with target TiC#5 installed has been leak checked and electric checked on NHC.

Attachment 1: TM4_with_TiC#5_20230508.png
TM4_with_TiC#5_20230508.png
  2485   Tuesday, August 29, 2023, 14:32 Frank SongNorth Hot-CellStandard OperationTM4Ta#65electrical check/leak check

 TM4 with new target Ta#65 has been E/L checked at NHCPost.

Attachment 1: TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
  2486   Tuesday, August 29, 2023, 14:32 Frank SongNorth Hot-CellStandard OperationTM4Ta#65electrical check/leak check

 TM4 with new target Ta#65 has been E/L checked at NHCPost.

Attachment 1: TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
  2492   Wednesday, October 04, 2023, 10:41 Frank SongSouth Hot-CellStandard OperationTM2Ta#66electrical check/leak check

 TM2 with new target Ta#66 had an electrical check and leak check on SHC. 

Attachment 1: TM2_with_Ta#66_electical_and_leak_check_in_SHC_2023-10-04.pdf
TM2_with_Ta#66_electical_and_leak_check_in_SHC_2023-10-04.pdf
  2500   Wednesday, November 08, 2023, 12:14 Frank SongSouth Hot-CellStandard OperationTM4UCx#43electrical check/leak check

 TM4 with new target UCx#43 was electrical and leak checked on SHC.

Attachment 1: TM4_electric_and_leak_checked_after_UCx#43_installed_2023-11-08.pdf
TM4_electric_and_leak_checked_after_UCx#43_installed_2023-11-08.pdf
  2573   Tuesday, April 30, 2024, 08:00 Frank SongSouth Hot-CellStandard OperationTM4Lp-Febiad emptyelectrical check/leak check

 David Wang made E/L checking before module moving to ITW. read attachment pls.

Attachment 1: TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf
TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf
  2650   Friday, August 09, 2024, 16:15 Frank SongSouth Hot-CellRepairTM3TiC#8electrical check/leak check

 TM3 with replaced target TiC#8 has been checked on SHC before moving to ITW. Pls see attachment

Attachment 1: electrical_and_leak_check_of_TM3_with_new_target_TiC#8_replaced_at_SHC_20240809.pdf
electrical_and_leak_check_of_TM3_with_new_target_TiC#8_replaced_at_SHC_20240809.pdf
  2656   Tuesday, August 13, 2024, 08:39 Frank SongSouth Hot-CellStandard OperationTM2Ta#67electrical check/leak check

 TM2 with new target Ta#67 had been electric/leak checked before moving to ITE. See attachment pls.

Attachment 1: TM2_with_Ta@67_electric_and_leak_check_on_SHC.pdf
TM2_with_Ta@67_electric_and_leak_check_on_SHC.pdf
  2662   Friday, August 16, 2024, 13:29 Frank SongSouth Hot-CellStandard OperationTM4Ta#68electrical check/leak check

 New target Ta#68 is installed on TM4 and be leak/electric checked. Pls see attachment.

Attachment 1: TM4_with_Ta#68_electric_and_leak_check_on_SHC_2028-08-16.pdf
TM4_with_Ta#68_electric_and_leak_check_on_SHC_2028-08-16.pdf
  2677   Tuesday, September 10, 2024, 12:41 Frank SongSouth Hot-CellStandard OperationTM4TiC#9 electrical check/leak check

 TM4 with new target TiC#9 Surface installed in SHC was leak/electric checked before moving to TCS. See attached pic pls.