  2785   Tuesday, March 18, 2025, 13:54 David WangITEStandard Operation  ITE water signals interlock annual checkITE water signals interlock annual check
is done today. all interlocks work . No issue.
  
  2786   Thursday, March 20, 2025, 13:10 David WangConditioning StationStandard Operation  TCS water system filters annual replacement has been done.TCS water system filters annual replacement
has been done. Plant group Dan Tower finished
the job and updated the inspection tags .
  
  2787   Tuesday, April 01, 2025, 09:47 Frank SongNorth Hot-CellRepair  Two NHC light bulbs replacement2 broken lights of NHC were replaced in
Target Hall. see pics attached.
 Image_(3).jpgImage_(4).jpgImage_(5).jpgImage_(6).jpgImage_(7).jpg 
  2788   Friday, April 04, 2025, 09:35 David WangCraneDevelopment  spent target pail and its lifting jigs load test Adam and I did  spent target pail
and its lifting jigs load test this morning. 
The load for full pail test is 263 lbs and
  
  2789   Friday, April 11, 2025, 13:34 chad fisherNorth Hot-CellRepair  remote end 9342 installedOn March 27 remote end 9342 was installed
on the west position (right hand as viewed
by operator) and arm 9**4 removed and moved
  
  2790   Friday, April 11, 2025, 13:46 chad fisherNorth Hot-CellRepair  Remote end 9**4 repairTong cable on remote arm 9**4 has be relocated
onto its pulleys and tong opening adjusted
at the tong cable drum by changing the position
  