Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2796     Entry time: Friday, April 25, 2025, 14:30
Author: Adam Newsome 
Category: Facilities 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Safety Walkaround complete - ISAC Hot Cells, Target Hall  

A safety walkaround was completed for the ISAC Hot Cells and Target Hall Areas.

The resulting spreadsheet can be found on DocuShare as Document-242733.

Main deficiencies identified:

  • Hot Cells:
    • Overdue fire extinguisher inspection
    • NHC oil level depleted - to be filled
    • SHC breathable air certification expired (may have been checked but just not updated - to follow up)
    • SHC left manipulator tong cable snapped (planned May 22 repair)
  • Target Hall:
    • NHC depression indicator calibration expired and reading is 0 (requested mech services to check this in Oct 2024)

Action has been, or will be, taken on all deficiencies.

ELOG V2.9.2-2455