Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2784     Entry time: Tuesday, March 11, 2025, 08:44
Author: David Wang 
Category: ITW 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: ITW:TP3,TP4, TP1S TP4S have been started since March 06th. 

To prevent TP bearings seize during shut down, ITW:TP3,TP4, TP1S TP4S have been started since March 06th. They work fine.  The plan is to switch them off this Thursday, and restart them in May before ITW in use.

ELOG V2.9.2-2455