Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2787
Entry time:
Tuesday, April 01, 2025, 09:47
Author:
Frank Song
Category:
North Hot-Cell
Type:
Repair
Module:
Target/Number:
Subject:
Two NHC light bulbs replacement
2 broken lights of NHC were replaced in Target Hall. see pics attached.
Attachment 1:
Image_(3).jpg
1.597 MB
|
Show
|
Hide all
Attachment 2:
Image_(4).jpg
1.772 MB
|
Show
|
Hide all
Attachment 3:
Image_(5).jpg
1.444 MB
|
Show
|
Hide all
Attachment 4:
Image_(6).jpg
1.512 MB
|
Show
|
Hide all
Attachment 5:
Image_(7).jpg
2.099 MB
|
Show
|
Hide all
ELOG V2.9.2-2455