Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2776     Entry time: Friday, February 21, 2025, 09:18
Author: David Wang 
Category: Cooling 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: HALCW pump ITC:MP1 and MP2 phase current draw measurement. 

HALCW pump ITC:MP1 and MP2 phase current draw measurement result: water supplied to both station. MP1: Black 17.0A, blue 16.9A, red 16.7A.   MP2: black 17.3A, blue17.8A, red 17.3A.    The results are good.  No concern on both motors.

ELOG V2.9.2-2455