ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  2736   Wednesday, December 18, 2024, 12:18 Adam NewsomeSpent Target VaultStandard Operation  Five Pails Transferred from Main Vault to Mini VaultFive pails were transferred from main vault
to mini vault. Note that there was already
one pail in the mini vault, so at present
 MiniVault_2024-12-18.pdf 
  2737   Wednesday, December 18, 2024, 14:17 Adam NewsomePail Handling ToolMaintenance  Pail Handling Tool - InspectionAn informal inspection of the main Pail
Handling Tool was performed today as the
final one for the year. Note that the main
 ISAC_Pail_Handling_Tool_Inspection_Record_-_2024.pdf 
  2738   Friday, January 03, 2025, 09:59 Adam NewsomeFacilitiesStandard Operation  Safety Walkaround complete - ISAC Hot Cells, Target HallA safety walkaround was completed for the
ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be
  
  2744   Thursday, January 09, 2025, 11:08 David WangFacilitiesMaintenance  ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readingsITH:MP1 is deteriorating by watching on
ITH:CG1 and CG2 readings and investigation
in pit. A fault 17644 has been issued. this
  
  2751   Monday, January 20, 2025, 11:33 Adam NewsomeWaste Package/ShipStandard Operation   F-308 flask loading - six flasks loaded Today (2025-01-20), six flasks were loaded
in preparation for   shipment with the following
targets: C#4, TiC#5, Ta#64,Ta#62, Nb#10,
 Target_Index_2025-01-20.xlsm 
  2752   Tuesday, January 21, 2025, 10:46 David WangITE/ITWStandard Operation  ITW/ITE pit general annual cleaning up.ITW/ITE pit general annual cleaning up
were done. all concrete floor and TM equipment
surface are vacuum  cleaned. HV cage
  
  2753   Wednesday, January 22, 2025, 10:29 Frank SongFaraday CageMaintenance  Annual clean up for ITE/ITW Faraday cages  David and I cleaned both cages in
ISAC1 electric room, all done.
  
  2756   Wednesday, January 29, 2025, 09:06 David WangITE/ITWStandard Operation  ITE and ITW water system paddle wheels and coils on flow sensors have been replacedITE and ITW water system paddle wheels
and coils on all flow sensors in pits have
been replaced. It's a SAS job. 
  
  2757   Wednesday, January 29, 2025, 11:10 chad fisherSouth Hot-CellStandard Operation  Pre-entry field CheckFields in the hot cell were checked using
a pole monitor. Field approximately in the
area someone would stand to repair manip.
 Image_(1).jpg 
  2758   Wednesday, January 29, 2025, 11:39 chad fisherNorth Hot-CellRepair  Model N Remote Arm #9342 Tong CableModel N remote arm serial #9342 tong cable
has been un-jammed from between pulley 3D
(see picture) and casting (this is an ongoing
 Model_N_Pulley_3D.JPG 
  2759   Thursday, January 30, 2025, 07:07 David WangCraneStandard Operation  target hall crane annual inspection.Tom Kauss finished TH crane annual inspection
yesterday. The crane woks  fine. Tom  has
this inspection record in his file. The crane
  
  2760   Thursday, January 30, 2025, 07:13 David WangCraneStandard Operation  inspection of target module lifting frames ITA0494-1997-01 and ITA1994-1997-02Tom  Gauss inspected  two target module
lifting frames ITA0494-1997-01   and  ITA0494-1997-02
yesterday. He certified the use of these
  
  2761   Thursday, January 30, 2025, 07:17 David WangCraneStandard Operation  inspection of target hall crane below hook attachment pins and plates ITA6550-01.Tom Kauss inspected target hall crane below
hook attachment pins and    plates ITA6550-01
yesterday. He certified the use of these
  
  2762   Monday, February 03, 2025, 13:04 David WangSafe Module ParkingMaintenance  ITW/ITW 24VDC electrical connectors for TP BVs MRO.ITW/ITW 24VDC electrical connectors for
TP BVs MRO has been done.  
  
  2763   Monday, February 03, 2025, 13:10 David WangCoolingStandard Operation  HALCW pump ITC:MP1 has been started. HALCW pump ITC:MP1 has been started. water
are supplied to both ITE and ITW system.
all water signals for individual circuits
  
  2764   Tuesday, February 04, 2025, 11:50 Alexander ShkuratoffITWStandard Operation  ITW HV bias test without module (Work permit I2025-02-03-2)Tuesday, February 04, 2025, 10:15

    Started voltage ramp up.
Using 250 V increments.

 Tuesday,
  
  2765   Wednesday, February 05, 2025, 13:46 Alexander ShkuratoffITEStandard Operation  ITE HV bias test without module (Work permit I2025-02-03-2) Wednesday, February 05, 2025, 12:20

    Ed has the voltage already
up to 1000 V. Starting further ramp up in
  
  2767   Tuesday, February 11, 2025, 10:36 chad fisherSouth Hot-CellRepairTM2 Conductor Block Insulator ReplacementCeramic conductor blocks ITD0053 and ITD0054
were replaced on TM2. Initially, only ITD0053
was to be replaced but after removing it
 Image_(12).jpegImage_(13).jpegImage_(14).jpeg 
  2768   Friday, February 14, 2025, 10:43 David WangITW/ITEStandard Operation  target pit CAD filter replacement in TH. Plant Group Gabril.T organized a target
pit CAD filter replacement and testing yesterday.
My group helped on this job.  small
  
  2770   Friday, February 14, 2025, 11:35 David WangConditioning StationStandard OperationTM2 TM2 TP1/TP2 and TCS TP1S have been started at TCS.TM2 TP1/TP2 and TCS:TP1S have been started
at TCS. The starting time and operation of
turbo pumps are ok. TM2 had been stored in
  