2733
|
Thursday, December 05, 2024, 11:43 |
Aaron Tam | South Hot-Cell | Standard Operation | | Ta#68 | Pail loading - Ta#68 & Others into Pail#300 |
December 5, 2024 - Aaron Tam w/ help from Chad, Peter and Adam at the Crane
Hot Cell Prep:
- Tools organized, working space cleared, spot for clean tool to sit placed, Air tool is open and spinning clockwise for tightening
Loading:
- Ta#68 was loaded into pail# 300
- PEEK seal parasitic assemblies loaded (PEEK seals were removed in ID: 2724)
- Farran had some old samples that also went in (More details to come when Farran sends the info)
Lid/latching:
Bail attachment:
- Some difficulty in attaching the Lifting Bail, but went on smoothly with the help of Chad
Notes:
- One of the PEEK seal parasitic Target assembly lids was missed in the loading. This will have to be loaded next time.
- All parasitic type targets remain in the yellow container shown in photos below.
|
Attachment 1: Pail_Landing.jpg
|
|
Attachment 2: Loaded_Pail.jpg
|
|
Attachment 3: Parasitic_Lid_that_was_missed.jpg
|
|
Attachment 4: Location_of_all_parasitic_type_targets_and_fasteners.jpg
|
|
Attachment 5: Parastics_and_Target_stuff_that_went_inside_this_pail.jpg
|
|
1897
|
Monday, March 25, 2019, 10:11 |
Aaron Schmidt | South Hot-Cell | Repair | TM2 | | LP-FEBIAD Test Target (empty) |
Link to previous target information: https://elog.triumf.ca/TIS/RH-ISAC/1039
Monday, March 25, 2019, 10:00: Target electrical checks (See Attachment 1)
Tested for TM2 |
Attachment 1: TM2_-_FEBIAD_target_-_Electrical_Test.pdf
|
|
2530
|
Thursday, January 25, 2024, 07:24 |
David Wang | Crane | Standard Operation | | | targe hall annual crane inspection |
Tom Kauss finished TH crane annual inspection yesterday. The crane woks fine. Tom has this inspection record in his file. The crane inspection tag has been issued for 2024. |