Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 140 of 140  Not logged in ELOG logo
Entry  Thursday, November 28, 2024, 16:13, Aaron Tam, South Hot-Cell, Standard Operation, , TiC#9 Parasitics, TiC#9 Parasitics Leak Check and removal from hotcell Leak_Test.jpgDissassembly.jpgSeal_Seat.jpgPEEK_seal.jpgPEEK_Seal_Closer_look.jpg

 November 27th, 2024 - Aaron Tam with Farran & David 

Parasitic Assembly Leak Check (Aaron, Farran, David)

-Note that the furthest upstream (right of the target) parasitic top cap screws had been loosened and retightened in error when attempting to remove it off TiC#9

-This puts this data point into question 

-Leak check starting from upstream to down stream 

-First parasitic had no leak 

-Second parasitic had some leak 

-Third parasitic was not pumping down at all

-First parasitic checked on test hose again with same success

Parasitic Dis-assembly (Aaron) 

-First parasitic had good tension in all 3 screws

-second parasitic had 2 screws with a perceptible breaking-loose of the screws, but one was imperceptible 

-Third parasitic had lower (than first parasitic), but okay tension in all 3 screws 

In an attempt to move the PEEK seal into a safe spot with tweezers, this one was accidentally sprung across the hotcell in the direction of the tool port 

A lengthy attempt to find it was conducted, but no PEEK seal was recovered 

This may effect our ability to do work during hot cell entries coming up. 

PEEK Seal extraction (Aaron, Farran) 

-A labeled bag was inserted into the hotcell via the tool port and onto an existing tray in the Hotcell

-PEEK seal placed inside bag, placed back on tray, and moved back to the tool port for extraction

-With tool port open, the draft was able to push the bag across the lift table. Changing the cross section exposed to the draft works to keep the bag from moving

-Farran used picker to extract the bag into the tool port where he wiped and placed into separate bag.

-This process was repeated for the second PEEK seal 

-Bags were wiped and swiped, put in another bag, swiped and brought over to Hot cell Service area Lab 

 

 

 

Entry  Tuesday, December 03, 2024, 15:53, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#68, Ta#68 Removal 22x

  Note: Ta#68 had a difficult install. See E-log ID# 2698 for more info 

First look:

  • Containment box cover looks the same as previous (See:ID: 2697)
  • Target shows large amount of soot-like deposits (See photos for locations)
  • Deposits seem to have been left on parts of the service tray as well ie.: Multipin connector 

Removal:

  • Removal was smooth
  • Water-line bracket fixing bolts seemed loose even before I put a tool to them 

Eyes of sides:

  • Better photos of where deposits are 
  • Everything else seems normal 
Entry  Wednesday, December 04, 2024, 14:30, Aaron Tam, South Hot-Cell, Standard Operation, , Ta#68, Ta#68 PIE 32x

 Abstract:
This target has seen some irregular beam patterns 
Possibility that the beam hit the walls of the target tube or even the cooling fins
This PIE we want to investigate how the irregular beam physically affected the target 

Related ELOGS: 
ID: 2728
ID: 2698

PIE was performed by Aaron Tam, Directed by Aurelia Laxdal, Observed by Lucas Backes, Special help from Chad Fisher 

External views:

  • Windows are clear of any irregularities 
  • More pictures of this can be found in RH-ISAC E-log 2728

Internal Views:

  • Heatshield internal
    • Some discolouration from heat and soot deposits.
    • This seems to be fairly clean to normal amounts - not concerning 
  • Target tube
    • tube is bent with the middle higher than the sides
    • Target tube was not removed 9/64ths allen wrench could not be located for this operation 
  • Target tube Exit
    • Heatshield windows were punctured to reveal the target tube entraces/exits
    • Entrance is waterline side (ITE)
  • Extraction electrode parts were removed from the back off the target
    • These parts look normal
    • some of the extraction electrode would not pull out due to tight fitting parts and the investigation stopped here.

Conclusion: Target physical condition is normal as far as we could investigate 

Entry  Thursday, December 05, 2024, 11:43, Aaron Tam, South Hot-Cell, Standard Operation, , Ta#68, Pail loading - Ta#68 & Others into Pail#300 Pail_Landing.jpgLoaded_Pail.jpgParasitic_Lid_that_was_missed.jpgLocation_of_all_parasitic_type_targets_and_fasteners.jpgParastics_and_Target_stuff_that_went_inside_this_pail.jpg

December 5, 2024 - Aaron Tam w/ help from Chad, Peter and Adam at the Crane  

Hot Cell Prep:

  • Tools organized, working space cleared, spot for clean tool to sit placed, Air tool is open and spinning clockwise for tightening 

Loading:

  • Ta#68 was loaded into pail# 300
  • PEEK seal parasitic assemblies loaded (PEEK seals were removed in ID: 2724)
  • Farran had some old samples that also went in (More details to come when Farran sends the info)

Lid/latching:

  • This went smoothly

Bail attachment:

  • Some difficulty in attaching the Lifting Bail, but went on smoothly with the help of Chad

Notes:

  • One of the PEEK seal parasitic Target assembly lids was missed in the loading. This will have to be loaded next time. 
  • All parasitic type targets remain in the yellow container shown in photos below. 
Entry  Monday, March 25, 2019, 10:11, Aaron Schmidt, South Hot-Cell, Repair, TM2, , LP-FEBIAD Test Target (empty)  TM2_-_FEBIAD_target_-_Electrical_Test.pdf

Link to previous target information: https://elog.triumf.ca/TIS/RH-ISAC/1039

Monday, March 25, 2019, 10:00: Target electrical checks (See Attachment 1)

Tested for TM2 

Entry  Thursday, January 25, 2024, 07:24, David Wang, Crane, Standard Operation, , , targe hall annual crane inspection 

Tom Kauss finished TH crane annual inspection yesterday. The crane woks fine. Tom has this inspection record in his file. The crane inspection tag has been issued for 2024.

ELOG V2.9.2-2455