  2175   Monday, January 04, 2021, 12:13 Adam NewsomeConditioning StationDevelopmentTM3 TM3 MoveTM3 was remotely moved from the
South Hot Cell to the conditioning station.
No containment box.
  
  2188   Tuesday, February 16, 2021, 14:00 Adam NewsomeCraneDevelopment  Crane pendant upgradeThe crane pendant for the main hoist was
upgraded to a FLEX EX2 style pendant by Canco
Cranes. The installation work was performed
 PXL_20210216_183711834.jpg 
  2206   Friday, March 26, 2021, 12:22 Adam NewsomeCraneDevelopment  Aux Hoist Pendant UpgradeThe crane pendant for the auxiliary hoist
was upgraded to a FLEX EX2 style  pendant
by Canco Cranes. The installation work was
  
  2231   Wednesday, July 07, 2021, 11:59 Adam NewsomeSafe Module ParkingMaintenance  Annual Electrical and Mechanical InspectionAn annual electrical and mechanical inspection
was performed on the SMP today by Adam Newsome,
Dan McDonald, and Jason Zhang as per Work
 Capture.PNGPXL_20210707_162143876.jpgPXL_20210707_162918257.jpg 
  2234   Thursday, July 15, 2021, 09:02 Adam NewsomeSpent Target VaultStandard Operation  Emergency Close Mechanism TestThe emergency close mechanism for the Storage
Vault door was tested  by Adam Newsome and
Travis Cave. The door was opened to its fully
  
  2235   Tuesday, July 20, 2021, 09:46 Adam NewsomeITEStandard OperationTM4 Remotely moved TM4 from TCS to ITETM4 was moved from the conditioning station
to the East target station. 
  
  2240   Tuesday, August 10, 2021, 10:16 Adam NewsomeSouth Hot-CellRepair  West Entrance Module Move to South Hot CellThe West Entrance Module has been moved
to the South Hot Cell for repair. 
  
  2241   Wednesday, August 11, 2021, 11:15 Adam NewsomeSpent Target VaultDevelopment  Mini-Storage: Cable track for e-chain installedA cable track was installed between the
mini-storage vault and the silos, for the
purpose of implementing a retractable cable
 PXL_20210811_165201449.jpg 
  2242   Thursday, August 12, 2021, 14:13 Adam NewsomeITWRepair  West Entrance Module Move to ITWThe West Entrance Module has been moved
from the South Hot Cell to the West Target
Station.
  
  2250   Thursday, September 23, 2021, 19:04 Adam NewsomeSpent Target VaultDevelopment  Mini-Storage: Remote CapabilityRemote capability was added for the mini-storage
door control. The control signals originate
from the Opto 22 Module box that is used
  
  2263   Tuesday, November 09, 2021, 14:35 Adam NewsomeSouth Hot-CellStandard OperationTM2UCX#36Module MoveTM#2 was moved from ITW to SHC,
then moved back to ITW.
  
  2268   Monday, November 15, 2021, 12:15 Adam NewsomeSouth Hot-CellRepair  Squeaking noise during turntable rotation - chain misalignment and improper tensionIt was noted on Nov. 9 that a squeaking
noise was present when the turntable was
rotated CCW with a module present.
 PXL_20211119_190640081.jpg 
  2271   Friday, November 19, 2021, 12:48 Adam NewsomeSouth Hot-CellDevelopment  Vertical motion limit switch installationA rotary limit switch was installed, attached
to the shaft adjacent to the drive motor
for the vertical drive system. This limit
 PXL_20211119_172142852.jpg 
  2272   Monday, November 22, 2021, 12:44 Adam NewsomeCraneRepair  Crane PLC Fault: 0004hAn issue was observed in which the target
hall crane was not functioning: the N-E-S-W
and up/down motions did not work, however
 Fault_code_when_connecting_Nov_22_2021.png 
  2274   Tuesday, November 23, 2021, 10:58 Adam NewsomeSouth Hot-CellStandard OperationTM4 TM4 MoveTM4 was moved from ITE to SHC. Shield plug
installed in ITE. 
  
  2276   Wednesday, November 24, 2021, 09:08 Adam NewsomeConditioning StationStandard OperationTM4 Remotely moved TM4 from SHC to TCSTM4 was moved from the South Hot Cell to
the Conditioning Station. 
  
  2278   Friday, November 26, 2021, 10:52 Adam NewsomeSpent Target VaultStandard Operation UC#35Spent Target MoveThe spent UC#35 target has been moved from
the south hot cell to the  spent target vault.
It was placed in pail #264 and put in spot
 Target_Index_2021-11-26.pdf 
  2309   Friday, February 25, 2022, 10:22 Adam NewsomeSouth Hot-CellDevelopment  Addition of E-Stops and Turntable Vertical Motion Limit SwitchTwo changes have been made to the control
system to the South Hot Cell:

    Addition of two emergency
  
  2318   Friday, May 06, 2022, 10:12 Adam NewsomeSpent Target VaultMaintenance  Annual Inspection of Mini-Storage VaultThe annual inspection of the mini-storage
vault was performed today. The following
items were checked:
  
  2366   Wednesday, September 14, 2022, 13:45 Adam NewsomeSpent Target VaultDevelopment  Storage Vault: cable replaced and e-chain upgradeThe motor cable for the storage vault was
replaced as the old one was showing signs
of wear. The U-track that the old cable ran
 PXL_20220914_183329159.jpg 