Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1842     Entry time: Wednesday, December 19, 2018, 14:41
Author: Anders Mjos 
Category: Conditioning Station 
Type: Standard Operation 
Module:  
Target/Number: No target 
Subject: Installed Shield Block on TCS 

Frank and Anders installed lid on TCS and started vacuum system yesterday. To run over the Holidays. Retrieved dose badge from operational storage area. Measured field to be ~ 10 mSv/h at ~9am. Beam went off about 8:30am.

ELOG V2.9.2-2455