Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2207     Entry time: Monday, April 12, 2021, 13:45
Author: Anders Mjos 
Category: Cooling 
Type: Maintenance 
Module:  
Target/Number:  
Subject: New T installed for instrumentation loop on HALCW system 

Adrian and co installed a new T to be able to add an instrument loop for O2 and pH monitoring on the low conductivity water systtem (photo). See WP I2021-04-09-4

Attachment 1: MicrosoftTeams-image_(9).png  132 kB  | Show | Hide all
ELOG V2.9.2-2455