Message ID: 2019     Entry time: Thursday, October 31, 2019, 08:49
Author: Anders Mjos 
Category: Conditioning Station 
Type: Repair 
Module:  
Target/Number:  
Subject: Water leak on non-active cooling water circuit 

Yesterday a leak was discovered in the ISAC-I experimental hall. The leak appears to be at the connection between the evaporator and the return water line. 1 in of water was lost from TCS:TK1. The water is currently valved off to prevent further leakage.

A fault reportt has been submitted to mechanical services - awaiting response.


Friday, November 01, 2019

Leak repaired by Mechanical Services. A brass fitting had cracked and was replaced with a galvanized fitting.