Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2218     Entry time: Tuesday, May 25, 2021, 16:20
Author: Anders Mjos 
Category: Conditioning Station 
Type: Maintenance 
Module:  
Target/Number:  
Subject: Chiller maintenance 

A contractor on site today for chiller maintenance. CP2 and CP3 circuit is leaking and shall not be used. CP1 can still be used. The contractor will contact Plant Group with a quote for repair and upgrades.

ELOG V2.9.2-2455