Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2142     Entry time: Thursday, August 27, 2020, 13:18
Author: Anders Mjos 
Category: Conditioning Station 
Type: Maintenance 
Module: TM2 
Target/Number:  
Subject: New Power Supply installed for TGHT 

Arthur installed a new Magna Power PS for the TGHT yesterday. The old power supply has been moved to Evaporator 2. The power supply was configured for remote operation and tested successfully with low current (30 A).

ELOG V2.9.2-2455