Entry  Monday, July 16, 2018, 17:41, Anders Mjos, ITE, Standard Operation, TM4, UC#22, Target module disconnected TM4_UCx_22#__disconnection_check_list_1.pdfTM4_UCx_22#__disconnection_check_list_2.pdf
The water and electrical connections were disconnected today as protons remained off after power interruption during the weekend. Vacuum is still connected
and operating.
 The vacuum system are disconnected 2018-07-17.  See attachment .
Entry  Wednesday, July 25, 2018, 13:21, Anders Mjos, ITW, Repair, TM2, Nb#8, Leak check of ITW Entrance_Module_Leak_2018-07-25.docx
ITW Entrance Module was leak checked yesterday with the support of Vacuum Group (Dimo & Edi). The leak detector was connected to primary backing
vacuum line. A leak response was found near the bellow for the beam profile monitor on top of the Entrance Module. It could be confirmed today by actuating
the monitor, that the leak was indeed at that location. The plan is to move the TM and Entrance Module out for target exchange and repair, respectively.
Entry  Wednesday, August 01, 2018, 15:12, Anders Mjos, South Hot-Cell, Standard Operation, TM2, UC#23, Target mounted - water leak on HS line 20180801_180130904_iOS.jpg
The heat shield water lines were not purged ahead of target exchange  in the hot cell. This resulted in water leaking onto the new target  assembly (heat
shield) when the cooling lines were opened at top and  bottom (for connecting leak detector). Excess water was wiped up with  paper towels.
Entry  Monday, September 24, 2018, 10:21, Anders Mjos, South Hot-Cell, Standard Operation, TM2, UC#23, Post Irradiation Examination (PIE) 20180924_161322929_iOS.jpg
UC#23 experienced short between target and heat shield as it was heated during operation. The inspection of the target after irradiation revealed that
the left target leg was close to the heat shield opening and likely the cause of the short. Marks could be seen on the leg indicating contact. See attached
photo. More photos are available on DocuShare
Entry  Monday, November 05, 2018, 14:27, Anders Mjos, Conditioning Station, Standard Operation, TM2, UC#25, Target module disconnected 
Frank and Anders disconnected the water and electrical connections this afternoon after the target was conditioned over the weekend. The heater ramping
program ran with the wrong gauge selected, causing the vacuum to go higher than planned. The module will be moved to ITW tomorrow.
Entry  Wednesday, November 07, 2018, 09:50, Anders Mjos, ITW, Standard Operation, TM2, UC#25, TM2 connected in ITW 
TM2 was connected yesterday by Frank and Anders. The West side panel with IG1S on Exit Module 2 was replaced with a new SST panel with 1 CF flange only
(dwg). Link to check list on DocuShare.
Entry  Wednesday, November 14, 2018, 16:10, Anders Mjos, ITW, Repair, TM2, UC#25, ITW:FC5 safety signal troubleshooting 2018-11-13_FC5.pdf
Measured resistance on safety limit switches for FC5 on Exit Module 2. Determined that the in connected signal did not work (shows not connected irregardless
of FC position). Confirmed proper operation of the OUT limit. See attachment for details. The Harp 5 x and y signal connectors were checked and reconnected.
Entry  Thursday, November 22, 2018, 08:52, Anders Mjos, ITE, Standard Operation, TM4, Ta#57, Closed ITE dump water 
Paddle wheel signal was tripping proton beam in ITW. Valved off ITE dump to divert flow to ITW. Field around valve was about 600 uSv/h
Entry  Thursday, November 22, 2018, 08:53, Anders Mjos, ITW, Standard Operation, TM2, UC#25, Block move 
Frank and Anders moved blocks from ITE to ITW yesterday
Entry  Thursday, November 22, 2018, 08:55, Anders Mjos, ITW, Repair, TM2, UC#25, ITW:FC5 safety signal limit switch installed FC5_limit_switch.jpg
Yesterday Diagnostics group installed a temporary external limit switch to provide the in signal to the safety system.
Entry  Tuesday, December 11, 2018, 14:35, Anders Mjos, ITE, Standard Operation, TM4, UC#26, Block move 
Blocks were moved from ITW to ITE by Frank and David. ITE water flow to dump was re-opened (ITW remains open). A dose badge was installed in the operation
storage area. Dose rates were measured to ~10 mSv/h at 1pm. Beam went off approximately 8:30am (with a short period of 2uA ending at 11am).
Entry  Wednesday, December 19, 2018, 14:41, Anders Mjos, Conditioning Station, Standard Operation, , No target, Installed Shield Block on TCS 
Frank and Anders installed lid on TCS and started vacuum system yesterday. To run over the Holidays. Retrieved dose badge from operational storage area.
Measured field to be ~ 10 mSv/h at ~9am. Beam went off about 8:30am.
Entry  Wednesday, January 02, 2019, 10:26, Anders Mjos, Conditioning Station, Standard Operation, , , Restarrted TP1S 
Found pumps off after the holidays. Restarted roughing pump and TP1S
Entry  Friday, March 01, 2019, 08:42, Anders Mjos, Conditioning Station, Standard Operation, TM2, , Conditioning TM2 without source tray TM2_BIAS_current_vs_voltage_2019-03.xlsxTM2_HV_Conditioning_2019-03-01.docx
BIAS and EZL connected. No water flowing into the module (water looped on top of module)
Friday, March 01, 2019, 08:20: 10kV
Friday, March 01, 2019, 08:40: 20kV
    Reply  Thursday, March 28, 2019, 12:48, Anders Mjos, Conditioning Station, Repair, TM2, dummy febiad test target, TM2 new source tray helium pressure test at TCS. 


    
        
            David Wang wrote:
        
        
            
            Helium pressure test on TM2 all water circuits is done. 70 psi helium , 10 minutes test time. Leak detector
Entry  Tuesday, October 01, 2019, 16:30, Anders Mjos, Conditioning Station, Standard Operation, TM2, Ta#58, Conditioning of Ta#58 
Tuesday, October 01, 2019, 15:15: Started roughing.
Tuesday, October 01, 2019, 16:30: Started TPs
Tuesday, October 01, 2019, 16:34: All TPs at speed
Entry  Thursday, October 31, 2019, 08:49, Anders Mjos, Conditioning Station, Repair, , , Water leak on non-active cooling water circuit 
Yesterday a leak was discovered in the ISAC-I experimental hall. The leak appears to be at the connection between the evaporator and the return water
line. 1 in of water was lost from TCS:TK1. The water is currently valved off to prevent further leakage.
A fault reportt has been submitted to mechanical
    Reply  Thursday, November 07, 2019, 10:39, Anders Mjos, Conditioning Station, Standard Operation, TM2, SiC#38, Conditioing SiC#38 SiC#38_ANODE_bias_2019-11-07.PNG
Thursday, November 07, 2019, 10:35: Tested source to 30 A on TGHT, TBHT and COIL. ANODE at 100 V.

Tuesday, November 12, 2019 
The FEBIAD source worked well over the weekend. The anode current limit was adjusted twice to stop voltage limiting. About 5E-8 A on the FC with
Entry  Thursday, February 27, 2020, 16:08, Anders Mjos, North Hot-Cell, Maintenance, , , Hot Cell Entry NHC_2020-02-27.pdf
Chad entered the NHC today to tighten set-screws on both slave side manipulators and re-align the West side slave. Work took place using the HC Confined
Space Entry procedure. See attached checklist. WP I2020-02-27-4
Entry  Thursday, March 19, 2020, 15:48, Anders Mjos, Conditioning Station, Maintenance, , , Filter replacement in water system March 5th 
Filters were replaced by Curtis von Cube on March 5th. See work permit for details I2020-03-05-5