Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1819     Entry time: Wednesday, November 07, 2018, 09:50
Author: Anders Mjos 
Category: ITW 
Type: Standard Operation 
Module: TM2 
Target/Number: UC#25 
Subject: TM2 connected in ITW 

TM2 was connected yesterday by Frank and Anders. The West side panel with IG1S on Exit Module 2 was replaced with a new SST panel with 1 CF flange only (dwg). Link to check list on DocuShare.

ELOG V2.9.2-2455