Message ID: 1752     Entry time: Wednesday, July 11, 2018, 15:09
Author: Anders Mjos 
Category: ITW 
Type: Maintenance 
Module: TM2 
Target/Number: Nb#8 
Subject: Uncovered ITW to toubleshoot 2A2M19 

The 2A2M19 beam profile monitor did not work and was e-faulted. After initial troubleshooting 2 blocks were removed form ITW to inspect the entrance module where the beam monitor is installed. The cable was found not to be connected and was quickly fixed. Blocks reinstalled. The work was done by Maico, Travis and Anders