Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1763     Entry time: Wednesday, August 01, 2018, 15:12
Author: Anders Mjos 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: UC#23 
Subject: Target mounted - water leak on HS line 

The heat shield water lines were not purged ahead of target exchange in the hot cell. This resulted in water leaking onto the new target assembly (heat shield) when the cooling lines were opened at top and bottom (for connecting leak detector). Excess water was wiped up with paper towels.

Attachment 1: 20180801_180130904_iOS.jpg  175 kB  | Show | Hide all
ELOG V2.9.2-2455