  ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  1878   Friday, March 01, 2019, 08:42 Anders MjosConditioning StationStandard OperationTM2 Conditioning TM2 without source trayBIAS and EZL connected. No water flowing
into the module (water looped on top of module)
Friday, March 01, 2019, 08:20: 10kV
 TM2_BIAS_current_vs_voltage_2019-03.xlsxTM2_HV_Conditioning_2019-03-01.docx 
  1902   Thursday, March 28, 2019, 12:48 Anders MjosConditioning StationRepairTM2dummy febiad test targetTM2 new source tray helium pressure test at TCS.


   
        
            
  
  1996   Tuesday, October 01, 2019, 16:30 Anders MjosConditioning StationStandard OperationTM2Ta#58Conditioning of Ta#58Tuesday, October 01, 2019, 15:15: Started
roughing.
Tuesday, October 01, 2019, 16:30:
  
  2019   Thursday, October 31, 2019, 08:49 Anders MjosConditioning StationRepair  Water leak on non-active cooling water circuitYesterday a leak was discovered in the
ISAC-I experimental hall. The leak appears
to be at the connection between the evaporator
  
  2026   Thursday, November 07, 2019, 10:39 Anders MjosConditioning StationStandard OperationTM2SiC#38Conditioing SiC#38Thursday, November 07, 2019, 10:35: Tested
source to 30 A on TGHT, TBHT and COIL. ANODE
at 100 V.
 SiC#38_ANODE_bias_2019-11-07.PNG 
  2073   Thursday, February 27, 2020, 16:08 Anders MjosNorth Hot-CellMaintenance  Hot Cell EntryChad entered the NHC today to tighten set-screws
on both slave side manipulators and re-align
the West side slave. Work took place using
 NHC_2020-02-27.pdf 
  2090   Thursday, March 19, 2020, 15:48 Anders MjosConditioning StationMaintenance  Filter replacement in water system March 5thFilters were replaced by Curtis von Cube
on March 5th. See work permit for details
I2020-03-05-5
  
  2140   Thursday, August 27, 2020, 09:42 Anders MjosConditioning StationMaintenanceTM2Ta#60Refilled TK2Refilled TCS:TK2 from 10 in to 22 in using
the newly installed valve.
  
  2142   Thursday, August 27, 2020, 13:18 Anders MjosConditioning StationMaintenanceTM2 New Power Supply installed for TGHTArthur installed a new Magna Power PS for
the TGHT yesterday. The old power supply
has been moved to Evaporator 2. The power
  
  2204   Thursday, March 25, 2021, 08:55 Anders MjosConditioning StationMaintenance  Filters inspected and cleaned on water circuitBy Curtis. See Work Permit I2021-03-24-1
for details.
  
  2207   Monday, April 12, 2021, 13:45 Anders MjosCoolingMaintenance  New T installed for instrumentation loop on HALCW systemAdrian and co installed a new T to be able
to add an instrument loop for O2 and pH monitoring
on the low conductivity water systtem (photo).
 MicrosoftTeams-image_(9).png 
  2208   Monday, April 12, 2021, 13:47 Anders MjosAssembly/Bench TestRepairTM4 Steerer wiringTravis assembled and tested the steerer
wires March 31st (see attached)
 TM4_Steerers_electric_check.pdf 
  2218   Tuesday, May 25, 2021, 16:20 Anders MjosConditioning StationMaintenance  Chiller maintenanceA contractor on site today for chiller
maintenance. CP2 and CP3 circuit is leaking
and shall not be used. CP1 can still be used.
  
  2219   Tuesday, May 25, 2021, 16:20 Anders MjosConditioning StationMaintenance  TK2 refilledTank refilled from 12 in to 25 in using
the new valve.
  
  1925   Friday, May 17, 2019, 16:46 Adam NewsomeSafe Module ParkingDevelopment  SMP Controls Installation Update 
The following controls-related
 IMG_20190417_100838.jpgIMG_20190417_100843.jpgIMG_20190517_162230.jpgIMG_20190517_162305.jpg 
  1952   Monday, July 22, 2019, 14:51 Adam NewsomeSouth Hot-CellStandard OperationTM4No TargetTM4 MoveTM4 has been moved from the South West
silo to the South Hot Cell. New source tray,
no target.
  
  1957   Wednesday, July 31, 2019, 08:57 Adam NewsomeSouth Hot-CellStandard OperationTM4No TargetTM4 MoveTM4 has been moved from the Conditioning
Station to the South Hot Cell. No target.
  
  1960   Tuesday, August 13, 2019, 09:49 Adam NewsomeSouth Hot-CellStandard OperationTM2Ta 58TM2 MoveTM2 was moved from ITE to South Hot Cell.
Tantalum 58 target. 
  
  1963   Thursday, August 15, 2019, 09:36 Adam NewsomeITEStandard OperationTM2ZrC #8TM2 MoveTM2 was moved from South Hot Cell to ITE.
ZrC #8 target. 
  
  1971   Tuesday, August 27, 2019, 13:12 Adam NewsomeSafe Module ParkingDevelopment  SMP Remote Control Wiring InspectionThe wiring for the SMP remote control module
was inspected by Joel Semilla (TRIUMF  electrician).
 The module was plugged in to verify there
  