Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1637     Entry time: Friday, October 06, 2017, 13:25
Author: Anders Mjos 
Category: Conditioning Station 
Type: Repair 
Module:  
Target/Number:  
Subject: HV Test 

 HV was brought up to 70 kV for 1 h without sparks to test the new water installation.

Attachment 1: 2017-10-06_HV_Water_Line_Test.xlsx  256 kB
ELOG V2.9.2-2455