Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
1637
Entry time:
Friday, October 06, 2017, 13:25
Author:
Anders Mjos
Category:
Conditioning Station
Type:
Repair
Module:
Target/Number:
Subject:
HV Test
HV was brought up to 70 kV for 1 h without sparks to test the new water installation.
Attachment 1:
2017-10-06_HV_Water_Line_Test.xlsx
256 kB
ELOG V2.9.2-2455