Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
|
RH-ISAC |
Not logged in |
 |
|
Tuesday, August 01, 2017, 14:39, Travis Cave, South Hot-Cell, Standard Operation, TM2, SiC#36, Electrical Check 
|
Tuesday, August 15, 2017, 09:27, Anders Mjos, South Hot-Cell, Standard Operation, TM2, SiC#36, Electrical Check of target in SHC
|
|
Message ID: 1597
Entry time: Tuesday, August 15, 2017, 09:27
In reply to: 1589
|
Author: |
Anders Mjos |
Category: |
South Hot-Cell |
Type: |
Standard Operation |
Module: |
TM2 |
Target/Number: |
SiC#36 |
Subject: |
Electrical Check of target in SHC |
|
|
Travis Cave wrote: |
The electrical check of TM#2 with SiC#36 attached. Post beam at the south hot cell. See attached results allow the before beam electrical check results are posted here as well.
|
by David and Chad after target removed from module:
Anode to target @500V - 65Kohm
Anode to HS - dead short
Target to HS@500V -62Kohm. |