Entry  Tuesday, August 01, 2017, 14:39, Travis Cave, South Hot-Cell, Standard Operation, TM2, SiC#36, Electrical Check TM2_SiC36_SHC_elec_chk.PDFTM2_SiC36_Postbeam_SHC_elec_chk.PDF
    Reply  Tuesday, August 15, 2017, 09:27, Anders Mjos, South Hot-Cell, Standard Operation, TM2, SiC#36, Electrical Check of target in SHC 
Message ID: 1597     Entry time: Tuesday, August 15, 2017, 09:27     In reply to: 1589
Author: Anders Mjos 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: SiC#36 
Subject: Electrical Check of target in SHC 

Travis Cave wrote:

The electrical check of TM#2 with SiC#36 attached. Post beam at the south hot cell. See attached results allow the before beam electrical check results are posted here as well.

by David and Chad after target removed from module:

Anode to target @500V - 65Kohm
Anode to HS - dead short
Target to HS@500V -62Kohm.