Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1668     Entry time: Tuesday, December 19, 2017, 10:41
Author: Anders Mjos 
Category: Crane 
Type: Maintenance 
Module:  
Target/Number:  
Subject: Crane powered down 

The target hall crane has been powered down by Don today in preparation for the power shutdown over the Holidays.

ELOG V2.9.2-2455