Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1648     Entry time: Thursday, October 19, 2017, 14:20
Author: Anders Mjos 
Category: Assembly/Bench Test 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Source tray inspection 

 Two minor chips in the main 60 kV insulators on the source tray was inspected today by Anders, Tom and Aurelia. The chips are small enough that they should not be a problem. See photos for details.

Attachment 1: Left_Insulator.jpg  1.906 MB  | Show | Hide all
Attachment 2: Right_Insulator.jpg  1.897 MB  | Show | Hide all
ELOG V2.9.2-2455